Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    Expenses 44 – 45 Water Department – Detailed Schedule of Revenues and Expenses 46 – 47 Wastewater ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  2. Basic Wood Framing

    Community Development | Page

    Laterally unsupported stud heighta (feet) Maximum spacing (inches) 2 × 3b — — — — — 10 16 2 × 4 10 24c 16 ... c — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... 5 FLOOR JOIST SPANS #2 SPF TABLE R502.3.1(2) Joist spacing 2X6 2X8 2X10 2X12 16” O.C. 9-4 12-3 15-5 17-10 ...

  3. City Council Regular Meeting

    City Council | Calendar Event | 07/13/15 04:00pm

    increase from 99.24% for 2013. The total special assessment collection rate increased Page 10 from 96. 57% ... in 2013 to 107. 16% in 2014. The fund balance of the City' s General Fund increased $ 154, 000 ... 838, 309 38% 7, 725, 923 100% 2013 1, 214,925 16% 3, 677,404 46% 2, 914,954 38% 7, 807,283 100% 2014 1, ...

  4. Financial Reports

    Finance | Page

    7 44 Statement of Cash Flows- Proprietary Funds Statement 8 45 Statement of Net Position- Fiduciary ... Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ... 15 107 Schedule of Pension Contributions- Public Employees Police and Fire Fund Statement 16 108 ...

  5. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... 750 over 750 26 $5.71 $3.99 $152.45 0 104 105 208 209 780 over 780 27 $5.71 $3.99 $158.16 0 108 109 ... 2 (next 4,000 gal) Per # of Units $4.16 / 1,000 gal. $ 5.25 / 1,000 gal. $6.58 / 1,000 gal. $10.51 / 1,000 ...

  6. City Council Regular Meeting

    City Council | Calendar Event | 05/14/12 04:00pm

    482,119 4th Ave NE (5th St- 7th St) 2013/2012-3 2 316,342 316,342 10th Ave NE (5th St- 7th St) 20142011-1 ... i2012-1 2 176,600 176,600 4th Ave NE (5th St- 7th St) 2013i2012-3 2 111,600 111,600 Wednesdav, May 09, 10/2 Source ... Project# Priority 2012 2013 20 2015 2016 Total 10th Ave NE (5th St- 7th St) 20142011-1 2 115,250 115,250 ...

  7. Decks

    Community Development | Page

    PERPENDICULAR TO JOIST OR 5/4 SOUTHERN PINE OR 2X6 AT 45 DEGREES TO JOIST 16” O.C. 5/4 AND 2X4 AT 45 DEGRESS TO ... 22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... SPAN (ft) 6’ and less 6’1” to 8’ 8’1” to1010’1” to 12’ 12’1” to 14’ 14’1” to 1616’1” to 18’ ...

  8. Fasteners

    Community Development | Page

    10 ½ 83 113 88 16d 3 ½“ 8 45 10 69 93 74 20d 4” 6 30 9 50 65 53 30d 4 ½“ 5 20 9 45 Not usually ... end nail 2-16d--- Stud to sole plate, toe nail 3-8d or 2-16d--- Double studs, face nail 10d 24” o.c. ... Double top plates, face nail 10d 24” o.c. Sole plate to joist or blocking at braced wall panels 3-16d 16 ...

  9. Garages: One Story

    Community Development | Page

    12” o.c. Hem Fir 6’1” 9’6” 12’2” 14’10” SPF 6’6” 10’2” 13’2” 15’9” 16” o.c. Hem Fir 5’6” 8’4” 10 ... POST FASTEN TOP PLATED TO HEADER WITH TWO ROWS OF 16D SINKER NAILS AT 3’ O.C. TYP. MAX. HEIGHT 10’ 1000 ... finished grade. WALL CONSTRUCTION Walls may be framed with minimum No. 3 grade studs spaced 16 or 24 inches ...

  10. City Council Regular Meeting

    City Council | Calendar Event | 01/13/14 04:00pm

    1/13/20141/13/2014 Title: ConsiderapprovingtheverifiedclaimsfortheperiodDecember10, 2013toJanuary6, 2014inthe ... ConsiderapprovingtheverifiedclaimsfortheperiodDecember10, 2013toJanuary6, 2014inthetotalamountof 717,450.98. RequestedCityCouncilAction ... ConsiderapprovingtheverifiedclaimsfortheperiodDecember10, 2013toJanuary6, 2014inthetotalamountof 717,450.98. CITYOFGRANDRAPIDSPage1of1Printedon5/14/2021 ...

Pages