Page not found

Search results

  1. Basic Wood Framing

    Community Development | Page

    Laterally unsupported stud heighta (feet) Maximum spacing (inches) 2 × 3b — — — — — 10 16 2 × 4 10 24c 16c ... — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 2424 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... (1) 2-2X8 9-1 (1) 5-4 (1) 5-0 (2) 4-9 (2) 2-2X10 7-0 (2) 6-7 (2) 6-1 (2) 5-9 (2) 2-2X12 8-1 (2) 7-7 ...

  2. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    150 over 150 6 $5.71 $3.99 $38.25 0 24 25 48 49 180 over 180 7 $5.71 $3.99 $43.96 0 28 29 56 57 210 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... over 210 8 $5.71 $3.99 $49.67 0 32 33 64 65 240 over 240 9 $5.71 $3.99 $55.38 0 36 37 72 73 270 over ...

  3. City Council Regular Meeting

    City Council | Calendar Event | 07/13/15 04:00pm

    a workshop session on April 24, 2015 to discuss and review the 2014 draft CAFR, the draft Report on Internal ... increase from 99.24% for 2013. The total special assessment collection rate increased Page 10 from 96. 57% ... Letter General Fund Detail of the preceding budget variances is presented in Statement 10 of the 2014 ...

  4. Public Utilities Financial Reports

    Public Utilities | Page

    Collection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  5. Decks

    Community Development | Page

    12” 34” 2X8 16” 29” 2X10 12” 49” 2X10 16” 42” 2X10 24” 34” 2X12 16” 57” 2X12 24” 47” Joists must bear ... 12” 49” 2X10 16” 42” 2X10 24” 34” 2X12 16” 57” 2X12 24” 47” 3 MAXIMUM POST HEIGHT IN FEET SPECIES SIZE ... 22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ...

  6. Financial Reports

    Finance | Page

    Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ... Notes to Financial Statements 49 Required Supplementary Information: Budgetary Comparison Schedule- ... Changes in Fund Balance- Nonmajor Debt Service Funds Statement 24 132 Subcombining Balance Sheet- Nonmajor ...

  7. City Council Regular Meeting

    City Council | Calendar Event | 01/13/14 04:00pm

    TOTALGENERALADMINISTRATION22,948.49 12/10/13-1/6/14INVESTMENTS-0- GRANDRAPIDSCITYCOUNCILBILLLIST-JANUARY13,2014 ... 1/13/20141/13/2014 Title: ConsiderapprovingtheverifiedclaimsfortheperiodDecember10, 2013toJanuary6, 2014 ... ConsiderapprovingtheverifiedclaimsfortheperiodDecember10, 2013toJanuary6, 2014inthetotalamountof 717,450.98. RequestedCityCouncilAction ...

  8. City Council Regular Meeting

    City Council | Calendar Event | 05/14/12 04:00pm

    St) 20132012-3 2 42,400 42,400 Ciry Wide Overlays-Urban 2014l1010-2 1 124,500 124,500 10th Ave NE (5th ... 10th Ave NE (5th St- 7th St) 20142011-1 2 98,100 98,100 7th St and 11th Avenue NE 2014l2011-3 2 19,100 ... AssessmeMS 124,500 124,500 GO Bonds 497,996 497,996 10th Ave NE (5th St- 7th St) 2014/2011-1 2 564,575 ...

  9. 2022 Cost of Service Studies

    Public Utilities | Page

    is shown at the end of Exhibit 2-A and in Table 2-4 below. A projected strong net income in 2022 is ... million or 16.3 percent of operating revenues. Projected Operating Results – Existing Rates- 7- Table 2-4 ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ...

  10. City Council Regular Meeting

    City Council | Calendar Event | 09/24/12 04:00pm

    Attachments: 9-24-12 Attachment 8& 10 Hanqer TKDA.pdf 5:55 ADMINISTRATION DEPARTMENT p.m. 15. 12-0581 ... assessments on CP 2014-1, 1st Avenue NE Reconstruction Atiachments: 9-24-12 Attachment CP 2014-1 Final ... September 24, 2012 7:45 ENGINEERING p.m. 24. 12-0606 A resolution adopting final assessments for CP 2014 ...

Pages