Page not found

Search results

  1. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17.00 $20.00 $25.00 $35.00 $50.00 Commodity ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ... in over a decade. In 2019, when GRPUC conducted the electric utility study, the AMI and AMR water ... Updated the electric cost of service rate study originally developed in 2019. > Energized the community ...

  3. 2023 City Water Rates

    Public Utilities | Page

    Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... 2" 3" 4" 6" Commodity Charges Rate $9.90 $13.80 $15.85 $17.76 $28.70 $108.70 $138.27 ...

  4. Data Request

    Police | Page

    Transcript $25.00/hour Physical Copies- up to 100 pages $0.25/page Physical Copies- 101 pages or more ... Certification Service $5.00/Instance 3.5" x 5" Photo Prints $10.00 base plus $0.25/photo 8" ... x 12" Photo Prints $10.00 base plus $0.25/photo Photo Copy-material provided by person making request  ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 71,303 Overhead lines 139,379 122,630 177,900 174,777 236,987 22,000 23,100 23,793 24,507 25,242 25 ... 2-A 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Historical Projected Grand Rapids Public ...

  6. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...  Agent ............................................................................................................. 3  2.5.  Engineering ...  of DER Equipment .................................................................................... 25  15  Certification ...

  7. Waste Management

    Engineering / Public Works | Page

    23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ... 26 27 28 29 21 22 23 24 25 26 27 25 26 27 28 29 30 30 28 29* 30 31 S M T W TH F S S M T W TH ... 14 15 16 16 17 18 19 20 21 22 13 14 15 16 17 18 19 17 18 19 20 21 22 23 23 24 25 26 27 28 29 20 21 22 ...

  8. Community Development Fee Schedule

    Community Development | Page

    each additional $1,000.00 or fraction thereof, to and including $25,000.00 (3-27-06) $25,001.00 to ... (3-27-06) $15.15* each Comprehensive Plan Appendix (3-27-06) $25.25* each Zoning Letter $35.35* each Zoning ... thereof, to and including $2,000.00 $2,001.00- $25,000.00 $70.00 * for the first $2,000.00 plus $14.20* for ...

  9. Itasca Clean Energy Solar Plus Battery Storage Project

    Public Utilities | Page

    facility includes a 2 Megawatt (MW) solar array paired with a 1 MW- 2.5 hour lithium ion battery surrounded ... with the community. The new facility includes a 2 Megawatt (MW) solar array paired with a 1 MW- 2.5 ... power in April 2022. • Anticipated 25-year lifespan. Battery Energy Storage System • 1 MW-2.5 hour ...

  10. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... Capital Project Funds Statement 25 138 Subcombining Statement of Revenues, Expenditures and Changes in ... Revenues, Expenditures and Changes in Fund Balance- Budget and Actual: Public Library Statement 27 144 ...

Pages