Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    Collection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ... aeration, gravity filtration, and zeolite softening. Treated water is stored in a 0.5 million gallon ... system includes three 0.5 million gallons elevated storage reservoirs and 81 miles of cast and ductile ...

  2. 2023 Electric Vehicle Service Rate Schedule

    Public Utilities | Page

    After: Customer Energy Charge Charge (per month) 4.15 26.25 existing or standalone charqe existing or All ... 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ... Effective 05/01/2021 I\...l--"--...l-i ""l /-i O /"'11"\-i I"\ ...

  3. Data Request

    Police | Page

    $0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ... stat. Sec. 13.03, Subd. 2 and 13.05, Subd. 5 and 8. The Minnesota Data Practices Act establishes ... the requirements of MN Statue 13.05, Subd 4(d) and the data subject may be contacted to verify that ...

  4. Chicken Permit

    Administration | Page

    submitted to City Hall  20-09-05 Ordinance amending and updating Article VIII (Chickens) within Chapter 10 ... includes a combination of cats, dogs, and chickens.   Please see the application and ordinance for more ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 9,450 9,734 10,026 10,326 10,636 Locating Expense 48,000 50,400 51,912 53,469 55,073 56,726 Meters ... 2-A 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Historical Projected Grand Rapids Public ...

  6. Basic Wood Framing

    Community Development | Page

    NJ Span NJ Roof and ceiling 2-2×4 2-10 1 2-6 1 2-3 1 2-2×6 4-2 1 3-8 2 3-3 2 2-2×8 5-4 2 4-7 2 4-1 ... 2 5-2 2 4-8 2 3-2×10 7-3 2 6-4 2 5-8 2 3-2×12 8-5 2 7-4 2 6-7 2 4-2×8 6-10 1 6-0 2 5-5 2 4-2×10 8-4 ... 3 4-7 3 4-1 4 3-2×8 4-8 2 4-1 2 3-8 2 3-2×10 5-9 2 4-11 2 4-5 3 3-2×12 6-8 2 5-9 2 5-2 3 4-2×8 5-5 2 4-8 ...

  7. ADA (Americans with Disabilities Act) Transition Plan

    Engineering / Public Works | Page

    employees is a requirement of the Americans with Disabilities Act (ADA) enacted on July 26, 1990. ADA is ... Z ada_transition_plan_complete_2019.pdf City of Grand Rapids ADA Transition Plan March 2018 Updated: October 2019 City of Grand Rapids ADA ... Introduction Transition Plan Need and Purpose The Americans with Disabilities Act (ADA), enacted on July 26 ...

  8. Financial Reports

    Finance | Page

    Fund Balance- Nonmajor Capital Project Funds Statement 26 140 Special Revenue Funds: Schedules of ... evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ... together with a parts distribution center. In September of 2019, 100% of the ASV shares were purchased by ...

  9. LOCAL SALES TAX INFORMATION

    Administration | Page

    a 0.5% sales tax that will be used to fund repairs and improvements to the IRA Civic Center. The State of ... Z new_local_tax_-_mn_department_of_revenue.pdf -------------------- m, DEPARTMENTOF REVENUE January 26, 2023 You are Registered for a New Local ... tax lines: Tax Location Rate Start Date Tax Line Number Sales Grand Rapids 0.5% April 1, 2023 351 Use ...

  10. Community Development Fee Schedule

    Community Development | Page

    $79.70 $113.03 $26.20 $51.80 $73.47 $1.00 $1.00 $1.00 $67.50 $132.50 $186.50 Fence over 6 feet in height ... $96.50 Egress Windows (new) $40.30 $26.20 $1.00 $67.50 Residential Window Replacement (8-9-10) $60.00 ... $1.00 $61.00 Furnace Replacement (3-27-06) $40.30 $26.20 $1.00 $67.50 Water Heater/Softener $40.30 ...

Pages