Page not found
Search results
-
Public Utilities Financial Reports
Public Utilities | Pagea cost of $2.3 million dollars, and financed through reserves. The Tioga 115 kV to 22.9 kV substation was ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ... in over a decade. In 2019, when GRPUC conducted the electric utility study, the AMI and AMR water ...
-
Community Development Fee Schedule
Community Development | PageZ community_development_fee_schedule_7-1-15_final-most_current.pdf COMMUNITY DEVELOPMENT Fee Schedule (as of July 1, 2015) Building Permits $1.00- $500.00 $23 ... .50* $501.00- $2,000.00 $23.75* for the first $500.00 plus $3.50 for each additional $100.00 or fraction ... Use Permit-General Sales and Service with a building footprint greater than 70,000 s.f. (5-14-07 ...
-
Distributed Energy Resources
Public Utilities | PageRapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Interconnection Coordinator .................................................................................... 3 2.3. Interconnection ... The contact information of the DER Interconnection Coordinator will be posted on the Area EPS Operator’s website if feasible, or available from the utility. 2.3 ...
-
City Council Regular Meeting
City Council | Page | 09/23/19 04:00pmMeeting with Agenda and Minutes Monday, September 23, 2019- 4:00pm Agenda Agenda Work Session ...
-
2023 Electric Security Light Rates
Public Utilities | PageEffective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ... $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ...
-
Data Request
Police | PageSignature: Date: Date Notified:data_practices_procedures_adopted_1-23-23.pdf 1 Approved by the City Council ... Signature:city_fee_schedule_-_adopted_1-23-23.pdf DEPARTMENTAL FEE SCHEDULE FOR CITY SERVICES Effective Date: 01/23/2023 CITY WIDE FEES Photo copy ... DEVELOPMENT Building Permits $1.00- $500.00 $23.50 * $501.00- $2,000.00 $23.75 * for the first $500.00 plus ...
-
2023 City Multi-Family Water Rate Schedule
Public Utilities | Pageover 630 22 $5.71 $3.99 $129.61 0 88 89 176 177 660 over 660 23 $5.71 $3.99 $135.32 0 92 93 184 185 690 ... over 1,260 43 $5.71 $3.99 $249.52 0 172 173 344 345 1,290 over 1,290 44 $5.71 $3.99 $255.23 0 176 177 ... $5.71 $3.99 $278.07 0 192 193 384 384 1,440 over 1,440 49 $5.71 $3.99 $283.78 0 196 197 392 392 1,470 ...
-
Sales Tax Fact Sheet
Administration | PageCounty 10/1/2017 Goodhue County 1/1/2019 Hennepin County 10/1/2017 Kandiyohi County 4/1/2018 Otter Tail ... County 1/1/2016 Ramsey County 10/1/2017 Rogers 10/1/2019 St. Louis County 4/1/2015 Sauk Centre 1/1/2020 ... 10/1/2019 Note: The following cities also have a $20 vehicle excise tax on sales of motor vehicles made by ...
-
Electric Distribution
Public Utilities | PageSeptember 1, 2015. In addition, beginning in 2019, the generation capacity charge for each year is based on ... kV to 22.9 kV substation was constructed in 2005 at the cost of $2.3 million dollars and financed ...
-
City Council Regular Meeting
City Council | Calendar Event | 07/13/15 04:00pmcitycouncil_agenda_2015-07-13.pdf Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings City Council ... Regular Meeting Sort A to Z citycouncil_closed_2015-07-13.pdf 01"./2(13 455 ... poweredbyLegistar™citycouncil_worksession_2015-07-13.pdf CITY OF GRAND RAPIDS 2 Meeting Agenda Full Detail City Council Work Session Monday, July 13, 2015 ...