Page not found

Search results

  1. 2023 Electric Security Light Rates

    Public Utilities | Page

    Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ...

  2. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28 ... Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ...

  3. Structural Engineers Reports

    Administration | Page

    Dear John, This report is intended to follow up on our previous reports dated 11-06-17 and 11-09- 17 ... (9/28/2007). No structural analysis was completed for this study. c) Structural Engineering Memorandum ... ridge. [Engineers Note: Measured, snow density measurements generally vary from 15 pcf to nearly 28 pcf ...

  4. Sales Tax Fact Sheet

    Administration | Page

    County 10/1/2017 Goodhue County 1/1/2019 Hennepin County 10/1/2017 Kandiyohi County 4/1/2018 Otter Tail ... County 1/1/2016 Ramsey County 10/1/2017 Rogers 10/1/2019 St. Louis County 4/1/2015 Sauk Centre 1/1/2020 ... 10/1/2019 Note: The following cities also have a $20 vehicle excise tax on sales of motor vehicles made by ...

  5. Chicken Permit

    Administration | Page

    submitted to City Hall  20-09-05 Ordinance amending and updating Article VIII (Chickens) within Chapter 10 ... includes a combination of cats, dogs, and chickens.   Please see the application and ordinance for more ...

  6. Community Development Fee Schedule

    Community Development | Page

    (3-27-06) $54.85* $35.65 $1.00 $91.50 Emergency Number Sign (10-13-09) $50.00 each Comprehensive Plan ... each additional $1,000.00 or fraction thereof, to and including $25,000.00 (3-27-06) $25,001.00 to ... Annual building Permit (as per MN Rule 1300.0120, Subparts 2 and 3) $505.00* Plan Review Fee (3-27-06 ...

  7. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    150 over 150 6 $5.71 $3.99 $38.25 0 24 25 48 49 180 over 180 7 $5.71 $3.99 $43.96 0 28 29 56 57 210 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... 16 $5.71 $3.99 $95.35 0 64 65 128 129 480 over 480 17 $5.71 $3.99 $101.06 0 68 69 136 137 510 over ...

  8. Itasca Clean Energy Solar Plus Battery Storage Project

    Public Utilities | Page

    Ziegler Cat lithium ion battery. • Began operating in October 2022. • Operated by a comprehensive ... cityofgrandrapidsmn.com/utilities Facebook: grpucmn 06.16.2023 ...

  9. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... Mapping 81,756 67,602 57,115 34,139 47,363------ Small tools 31,520 22,379 15,027 17,833 30,801 28 ... 2-A 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Historical Projected Grand Rapids Public ...

  10. Public Utilities Financial Reports

    Public Utilities | Page

    electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ... in over a decade. In 2019, when GRPUC conducted the electric utility study, the AMI and AMR water ... Updated the electric cost of service rate study originally developed in 2019. > Energized the community ...

Pages