Page not found

Search results

  1. Sales Tax Fact Sheet

    Administration | Page

    County 10/1/2017 Goodhue County 1/1/2019 Hennepin County 10/1/2017 Kandiyohi County 4/1/2018 Otter Tail ... County 1/1/2016 Ramsey County 10/1/2017 Rogers 10/1/2019 St. Louis County 4/1/2015 Sauk Centre 1/1/2020 ... 10/1/2019 Note: The following cities also have a $20 vehicle excise tax on sales of motor vehicles made by ...

  2. 2023 Electric Security Light Rates

    Public Utilities | Page

    Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ...

  3. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... 12 $5.71 $3.99 $72.51 0 48 49 96 97 360 over 360 13 $5.71 $3.99 $78.22 0 52 53 104 105 390 over 390 ...

  4. Chicken Permit

    Administration | Page

    submitted to City Hall  20-09-05 Ordinance amending and updating Article VIII (Chickens) within Chapter 10 ... includes a combination of cats, dogs, and chickens.   Please see the application and ordinance for more ...

  5. Public Utilities Financial Reports

    Public Utilities | Page

    to 22.9 kV for distribution to 6 major substations, 5 rural step-down stations, or directly ... transformed to consumer applicable voltages. The main 115 kV to 22.9 kV substation was constructed in 2005 at ... a cost of $2.3 million dollars, and financed through reserves. The Tioga 115 kV to 22.9 kV substation was ...

  6. Community Development Fee Schedule

    Community Development | Page

    (3-27-06) $54.85* $35.65 $1.00 $91.50 Emergency Number Sign (10-13-09) $50.00 each Comprehensive Plan ... Use Permit-General Sales and Service with a building footprint greater than 70,000 s.f. (5-14-07 ... -Res. 07-35) Total Actual Cost Incurred by the City ($3,500 deposit required via escrow agreement) ...

  7. 2022 Cost of Service Studies

    Public Utilities | Page

    contract with MP which became effective 1/1/22 has a significant impact on the overall results. An overall ... center. The combined capital improvements for the electric utility are shown in Table 2-2 below. Projected ... Operating Results – Existing Rates- 5- Table 2-2 Capital Improvements Capital Item 2022 2023 2024 2025 2026 ...

  8. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 01/13/14 04:00pm

    poweredbyLegistar™ GRANDRAPIDSCITYCOUNCILBILLLIST-JANUARY13,2014 DATE:01/09 ... GRANDRAPIDSCITYCOUNCILBILLLIST-JANUARY13,2014 DATE:01/09/2014CITYOFGRANDRAPIDSPAGE:2 TIME:10:10:44DEPARTMENTSUMMARYREPORT ID:AP443000.CGR ... 1920240STERLELAWOFFICE260.00 2001750TAUTGESREDPATH&COLTD3,860.17 TOTALFINANCE22,178.90 FIRE ...

  10. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...  .......................................................................................................................... 2  2.2.  DER ...   Interconnection Coordinator. Official definitions of each entity are defined in the  Glossary (Section 13). Additional details are explained in the subsections below.    2.2 ...

Pages