Page not found

Search results

  1. 2023 Electric Security Light Rates

    Public Utilities | Page

    $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ... – Existing Pole 4200 Lumens 40 Watt LED LAMPS – Separate Pole 6600 Lumens 70 Watt LED LAMPS – Existing Pole ... and replacement fixtures will be either 40 or 70 watt LED lamps. All other fixture types shall be ...

  2. Data Request

    Police | Page

    Data not on Individuals Meaning of Classification Public MS §13.02, subd. 15 Public MS §13.02, subd. 15 ... Public MS §13.02, subd. 4 Available to anyone for any reason Private MS §13.02, subd. 12 Private MS ... §13.10, subd. 1B Nonpublic MS §13.02, subd. 9 Available only to the data subject and to anyone authorized ...

  3. Community Development Fee Schedule

    Community Development | Page

    Door (12-17-12) $40.00 $1.00 $41.00 Siding Replacement (3-27-06) $60.00 $1.00 $61.00 All Regulated ... high (non enclosed) Attached Steps/Deck (non enclosed) Covered porch (non enclosed) (2-9-15) $40 ... $96.50 Egress Windows (new) $40.30 $26.20 $1.00 $67.50 Residential Window Replacement (8-9-10) $60.00 ...

  4. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... effluent per day; 4.0 million gallons from UPM/Blandin Paper Company and 1.5 million gallons from domestic ... AMI and AMR data. SEH was hired in 2020 to complete updates to the Comprehensive Water and Wastewater ...

  5. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... improvements described in the capital improvement plan. 1.02. Before the approval of the capital improvement ... as a whole. The Plan is hereby approved. 2.02 City staff are hereby authorized to do all other things ...

  6. 2022 Cost of Service Studies

    Public Utilities | Page

    projected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 2-A 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Historical Projected Grand Rapids Public ...

  7. Permit Fee Calculator

    Community Development | Page

    $0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ... $800.00 $34.25 $22.26 $0.40 $56.91 $2,001.00- $25,000.00 Project Cost Permit Fee Plan Review Fee State ... Surcharge Total Fee $4,000.00 $98.40 $63.96 $2.00 $164.36 No Plan Review Total $100.40 $25,001.00- ...

  8. 2023 City Water Rates

    Public Utilities | Page

    Gallons Next 22,000 Gallons All Gallons Over 30,000 City Commercial First 40,000 Gallons Next 360,000 ... Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 01/13/14 04:00pm

    1$.$02$%&345&6437&+ 8' 9'%:&;5& EASHEGB 643 <&" &+,$&+ 0 9 +& 3> ... 0112220ALERTALLCORPORATION905.40 0118625ARROWEMBROIDERY228.29 0118661ARROWHEADREGIONALFIREFIGHTR65.00 ... 2305453WESCORECEIVABLECORP701.78 2309548WINTEREQUIPMENTCOINC6,849.07 TOTALPUBLICWORKS46,641.01 FLEETMAINTENANCE ...

  10. Administration

    Public Utilities | Page

    needed. In 2020, David Berg Consulting conducted an electric cost of service and rate design study to ... Administration Sort A to Z 2023-07-19_organizational_chart.pdf Customers Commission Secretary Luke Francisco Term ... Maintenance III Eric Drotts 2022-07-19 Organizational Chart.vsdx All Positions ...

Pages