Page not found

Search results

  1. City Council Regular Meeting

    City Council | Calendar Event | 01/13/14 04:00pm

    TOTALGENERALADMINISTRATION22,948.49 12/10/13-1/6/14INVESTMENTS-0- GRANDRAPIDSCITYCOUNCILBILLLIST-JANUARY13,2014 ... 1/13/20141/13/2014 Title: ConsiderapprovingtheverifiedclaimsfortheperiodDecember10, 2013toJanuary6, 2014 ... ConsiderapprovingtheverifiedclaimsfortheperiodDecember10, 2013toJanuary6, 2014inthetotalamountof 717,450.98. RequestedCityCouncilAction ...

  2. City Council Regular Meeting

    City Council | Calendar Event | 07/13/15 04:00pm

    in 2013 to 107. 16% in 2014. The fund balance of the City' s General Fund increased $ 154, 000 ... 838, 309 38% 7, 725, 923 100% 2013 1, 214,925 16% 3, 677,404 46% 2, 914,954 38% 7, 807,283 100% 2014 1, ... Letter General Fund Detail of the preceding budget variances is presented in Statement 10 of the 2014 ...

  3. Basic Wood Framing

    Community Development | Page

    Laterally unsupported stud heighta (feet) Maximum spacing (inches) 2 × 3b — — — — — 10 16 2 × 4 10 24c 16 ... c — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... (1) 2-2X8 9-1 (1) 5-4 (1) 5-0 (2) 4-9 (2) 2-2X10 7-0 (2) 6-7 (2) 6-1 (2) 5-9 (2) 2-2X12 8-1 (2) 7-7 ...

  4. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... F S 1 2 3 4 1 2 1 2 3 4 5 6 7 5 6 7 8 9 10 11 3 4 5 6 7 8 9 8 9 10 11 12 13 14 12 13 14 15 16 17 18 10 11 12 13 14 15 16 15 16 17 18 19 20 21 ... Z 2023_wm_calender.pdf S M T W TH F S S M T W TH F S S M T W TH F S 1 2 3 4 1 2 3 4 1 2 3 4 5 6 7 5 6 7 8 9 10 11 ...

  5. Decks

    Community Development | Page

    12” 34” 2X8 16” 29” 2X10 12” 49” 2X10 16” 42” 2X10 24” 34” 2X12 16” 57” 2X12 24” 47” Joists must bear ... 12” 49” 2X10 16” 42” 2X10 24” 34” 2X12 16” 57” 2X12 24” 47” 3 MAXIMUM POST HEIGHT IN FEET SPECIES SIZE ... 22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ...

  6. City Council Regular Meeting

    City Council | Calendar Event | 05/14/12 04:00pm

    St) 20132012-3 2 42,400 42,400 Ciry Wide Overlays-Urban 2014l1010-2 1 124,500 124,500 10th Ave NE (5th ... 10th Ave NE (5th St- 7th St) 20142011-1 2 98,100 98,100 7th St and 11th Avenue NE 2014l2011-3 2 19,100 ... AssessmeMS 124,500 124,500 GO Bonds 497,996 497,996 10th Ave NE (5th St- 7th St) 2014/2011-1 2 564,575 ...

  7. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    2 (next 4,000 gal) Per # of Units $4.16 / 1,000 gal. $ 5.25 / 1,000 gal. $6.58 / 1,000 gal. $10.51 / 1,000 ... Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ...

  8. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Department 10,000 Library 26 000 IRA Civic Center 49,200 Blandin Beach Park 2,025 Grand Rapids Sports Complex ... the City of Grand Rapids has adopted and implemented 10 performance measures developed by the Council ... on Local Results and Innovation. Attachments: 2011 Survey Resuits.odf 10 Performance Measures ...

  10. Public Utilities Financial Reports

    Public Utilities | Page

    Collection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

Pages