Page not found

Search results

  1. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...

  2. Basic Wood Framing

    Community Development | Page

    1 1-8 1 1-5 2 2-2×6 2-11 2 2-7 2 2-3 2 2-2×8 3-9 2 3-3 2 2-11 3 2-2×10 4-7 3 4-0 3 3-6 3 2-2×12 5-4 ... 1-9 (1) 2-2X6 3-2 (2) 3-0 (2) 2-9 (2) 2-7 (2) 2-2X8 4-1 (2) 3-10 (2) 3-6 (2) 3-4 (2) 2-2X10 4-11 (2) ... NJ Span NJ Roof and ceiling 2-2×4 2-10 1 2-6 1 2-3 1 2-2×6 4-2 1 3-8 2 3-3 2 2-2×8 5-4 2 4-7 2 4-1 ...

  3. Waste Management

    Engineering / Public Works | Page

    Z 2023_wm_calender.pdf S M T W TH F S S M T W TH F S S M T W TH F S 1 2 3 4 1 2 3 4 1 2 3 4 5 6 7 5 6 7 8 9 10 11 ... 5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ...

  4. City Council Regular Meeting

    City Council | Calendar Event | 01/13/14 04:00pm

    1/13/20141/13/2014 Title: ConsiderapprovingtheverifiedclaimsfortheperiodDecember10, 2013toJanuary6, 2014 ... ConsiderapprovingtheverifiedclaimsfortheperiodDecember10, 2013toJanuary6, 2014inthetotalamountof 717,450.98. RequestedCityCouncilAction ... ConsiderapprovingtheverifiedclaimsfortheperiodDecember10, 2013toJanuary6, 2014inthetotalamountof 717,450.98. CITYOFGRANDRAPIDSPage1of1Printedon5/14/2021 ...

  5. City Council Regular Meeting

    City Council | Calendar Event | 07/13/15 04:00pm

    lacement 150,000 96, 000 160,000 214,000 5, 000 26 1 Street Li ht and Utility Services 10,000 10,000 27 ... Letter General Fund Detail of the preceding budget variances is presented in Statement 10 of the 2014 ... the Council entrance. 5: 02 PUBLIC FORUM PM 5: 07 COUNCIL REPORTS PM 5: 10 APPROVAL OF MINUTES PM ...

  6. City Council Regular Meeting

    City Council | Calendar Event | 07/27/15 04:00pm

    6,230 2, 000 885 2, 000 47,290 41, 122 36, 327 43,071 42,000 23, 896 42, 000 10, 158 8, 458 10,074 6, ... BUDGET 10: 24 AM7/ 23/ 2015 YTD PROPOSED 2011 2012 2013 2014 2015 ACTUAL 2016 ACTUAL ACTUAL ACTUAL ACTUAL ... 176, 993 195, 029 207, 191 224,206 111, 153 212, 216 10:21 AM7/23/2015citycouncil_agenda_2015-07-27 ...

  7. City Council Regular Meeting

    City Council | Calendar Event | 05/14/12 04:00pm

    St) 20132012-3 2 42,400 42,400 Ciry Wide Overlays-Urban 2014l1010-2 1 124,500 124,500 10th Ave NE (5th ... 10th Ave NE (5th St- 7th St) 20142011-1 2 98,100 98,100 7th St and 11th Avenue NE 2014l2011-3 2 19,100 ... AssessmeMS 124,500 124,500 GO Bonds 497,996 497,996 10th Ave NE (5th St- 7th St) 2014/2011-1 2 564,575 ...

  8. Community Development Fee Schedule

    Community Development | Page

    (3-27-06) $54.85* $35.65 $1.00 $91.50 Emergency Number Sign (10-13-09) $50.00 each Comprehensive Plan ... each additional $1,000.00 or fraction thereof, to and including $25,000.00 (3-27-06) $25,001.00 to ... $50,000.00 $391.65* for the first $25,000.00 plus $10.20* for each additional $1,000.00 or fraction thereof, ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Department 10,000 Library 26 000 IRA Civic Center 49,200 Blandin Beach Park 2,025 Grand Rapids Sports Complex ... the City of Grand Rapids has adopted and implemented 10 performance measures developed by the Council ... on Local Results and Innovation. Attachments: 2011 Survey Resuits.odf 10 Performance Measures ...

  10. Public Utilities Financial Reports

    Public Utilities | Page

    Expenses 44 – 45 Water Department – Detailed Schedule of Revenues and Expenses 46 – 47 Wastewater ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

Pages