Page not found

Search results

  1. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...

  2. Data Request

    Police | Page

    a period of 10 business days from the date you are notified. Second request for reports, after failure to ... data. This should be done within 10 days after receiving the request. If the summary data cannot be ... prepared within 10 days, the Responsible Authority must notify the requestor of the anticipated time ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    Combining Schedules of Revenues and Expenses 43 Electric Department – Detailed Schedule of Revenues and ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  4. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    Groom, Recorder GREDA Regular Meeting 2 Thursday, February 28, 2019 DATE: 03/ 22/ 2019 TIME: 11: 08: 07 ... INVOICES DUE ON/ BEFORE 03/ 28/ 2019 PAGE: 1 VENDOR # NAME AMOUNT DUE EDA- CAPITAL PROJECTS AIRPORT SOUTH ... of`'. i C{i By:.. 6 Title. Dated this- 7 day of F03pj6ff-j By:' Title: Grand Rapids Economic ...

  5. Utility Information

    Engineering / Public Works | Page

    Commercial $48.98 per acre per month. Industrial $48.98 per acre per month. Institutional $43.44 per acre per month. ... Practices Credit Policy (As per Section 70-203(b) of Ordinance No. 17-05-03) Background On May 8, 2017, the ... Grand Rapids City Council approved a Stormwater Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, ...

  6. Stormwater Credits Policy

    Engineering / Public Works | Page

    Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... Ordinance No. 17-05-03) Background On May 8, 2017, the Grand Rapids City Council approved a Stormwater ... 90 days of approval. No retroactive credits will be approved or applied to billings. Per section ...

  7. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Department 10,000 Library 26 000 IRA Civic Center 49,200 Blandin Beach Park 2,025 Grand Rapids Sports Complex ... the City of Grand Rapids has adopted and implemented 10 performance measures developed by the Council ... on Local Results and Innovation. Attachments: 2011 Survey Resuits.odf 10 Performance Measures ...

  8. Public Information Requests

    Administration | Page

    preparing or supplying the summary data. This should be done within 10 days after receiving the request. If ... the summary data cannot be prepared within 10 days, the Responsible Authority must notify the ... Within 30 days, 7 Approved by the City Council on xx/xx/03 the Responsible Authority or designee must ...

  9. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    150 over 150 6 $5.71 $3.99 $38.25 0 24 25 48 49 180 over 180 7 $5.71 $3.99 $43.96 0 28 29 56 57 210 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... over 690 24 $5.71 $3.99 $141.03 0 96 97 192 193 720 over 720 25 $5.71 $3.99 $146.74 0 100 101 200 201 ...

  10. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 10,394,294 10,510,369 10,628,022 10,747,276 10,868,611 Rural residential 1,023,159 1,136,791 1,125,900 ... OPERATING EXPENSES Purchased Power 10,991,941$ 11,169,489$ 11,336,920$ 11,069,792$ 13,611,143$ 11,807,430$ ...

Pages