Page not found

Search results

  1. Waste Management

    Engineering / Public Works | Page

    5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 14 15 16 16 17 18 19 20 21 22 13 14 15 16 17 18 19 17 18 19 20 21 22 23 23 24 25 26 27 28 29 20 21 22 ... F S 1 2 3 4 1 2 1 2 3 4 5 6 7 5 6 7 8 9 10 11 3 4 5 6 7 8 9 8 9 10 11 12 13 14 12 13 14 15 16 17 18 10 11 12 13 14 15 16 15 16 17 18 19 20 21 ...

  2. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...

  3. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    Meeting with Agenda and Minutes Thursday, March 28, 2019- 4:00pm Agenda Image Slideshow Display ... Pokegama Avenue, in Grand Rapids, Minnesota on Thursday, March 28, 2019 at 4:00pm. AGENDA 1. Call to Order ... Approval ofminutes from the February 28, 2019 regular meeting. 5. Consider approval of claims 6. IEDC ...

  4. Public Utilities Financial Reports

    Public Utilities | Page

    prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ... treatment facility capable of treating 3.24 million gallons of water per day. Water treatment consists of ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 125,563 17,900 35,071 28,763 19,593 23,858 16,800 16,800 16,800 16,800 16,800 CSC Building/Grounds ... Operating Expenses (15,133,717) (16,471,822) (17,535,707) (18,642,543) (19,600,947) (20,298,209) Less ...

  6. Basic Wood Framing

    Community Development | Page

    Laterally unsupported stud heighta (feet) Maximum spacing (inches) 2 × 3b — — — — — 10 16 2 × 4 10 24c 16 ... c — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... 5 FLOOR JOIST SPANS #2 SPF TABLE R502.3.1(2) Joist spacing 2X6 2X8 2X10 2X12 16” O.C. 9-4 12-3 15-5 17-10 ...

  7. Footings, Foundations & Slabs

    Community Development | Page

    garage floor slabs 3,500c,d a. At 28 days psi. b. Concrete in these locations that may be subject to ... during the first 28 days. Strength of concrete also increases as the water-cement ratios decrease. While ... Mixtures Are Not Available Specified 28-day compressive strength, f’c psi Water-cement ratio by weight ...

  8. Financial Reports

    Finance | Page

    evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ... Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ... 15 107 Schedule of Pension Contributions- Public Employees Police and Fire Fund Statement 16 108 ...

  9. Decks

    Community Development | Page

    22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... SPAN (ft) 6’ and less 6’1” to 8’ 8’1” to1010’1” to 12’ 12’1” to 14’ 14’1” to 1616’1” to 18’ ... SHEATHING AND ½” STACKED WASHERS2,8 36 36 29 24 21 18 16 1 The tip of the lag screw shall fully extend ...

  10. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Department 10,000 Library 26 000 IRA Civic Center 49,200 Blandin Beach Park 2,025 Grand Rapids Sports Complex ... the City of Grand Rapids has adopted and implemented 10 performance measures developed by the Council ... on Local Results and Innovation. Attachments: 2011 Survey Resuits.odf 10 Performance Measures ...

Pages