Page not found

Search results

  1. Waste Management

    Engineering / Public Works | Page

    23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ... 26 27 28 29 21 22 23 24 25 26 27 25 26 27 28 29 30 30 28 29* 30 31 S M T W TH F S S M T W TH ... 14 15 16 16 17 18 19 20 21 22 13 14 15 16 17 18 19 17 18 19 20 21 22 23 23 24 25 26 27 28 29 20 21 22 ...

  2. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ... a cost of $2.3 million dollars, and financed through reserves. The Tioga 115 kV to 22.9 kV substation was ...

  4. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    amaFi. ed 10 y 1 3/27/2015 MRM Management (MeAdly) GRD 32,698:67 19 Nov 13 19841 1 Bas 18 27; 02150 2nd ... Meeting with Agenda and Minutes Thursday, March 28, 2019- 4:00pm Agenda Image Slideshow Display ... 2019 4: 00pm Grand Rapids City Hall NOTICE IS HEREBY GIVEN, that a regular meeting of the Grand Rapids ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... rates is summarized in Table 2-3. A detailed presentation of the operating results is shown in Exhibit ... 2-A. Section 2- 6- Table 2-3 Projected Operating Results Existing Rates Year 2022 2023 2024 2025 2026 ...

  6. City Council Regular Meeting

    City Council | Calendar Event | 07/27/15 04:00pm

    176, 993 195, 029 207, 191 224,206 111, 153 212, 216 10:21 AM7/23/2015citycouncil_agenda_2015-07-27 ... Details (With Text) 15-1509 Version: 1 Name: Agenda Item Status: 7/ 23/2015 In control: 7/ 27/ 2015 Final ... Usage Total Revenues 10: 24 AM7/23/2015 68, 309 6, 477- 1, 099, 467 765, 312 799, 230 780, 021 779, 198 ...

  7. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Department 10,000 Library 26 000 IRA Civic Center 49,200 Blandin Beach Park 2,025 Grand Rapids Sports Complex ... the City of Grand Rapids has adopted and implemented 10 performance measures developed by the Council ... on Local Results and Innovation. Attachments: 2011 Survey Resuits.odf 10 Performance Measures ...

  8. Community Development Fee Schedule

    Community Development | Page

    (3-27-06) $54.85* $35.65 $1.00 $91.50 Emergency Number Sign (10-13-09) $50.00 each Comprehensive Plan ... Z community_development_fee_schedule_7-1-15_final-most_current.pdf COMMUNITY DEVELOPMENT Fee Schedule (as of July 1, 2015) Building Permits $1.00- $500.00 $23 ... .50* $501.00- $2,000.00 $23.75* for the first $500.00 plus $3.50 for each additional $100.00 or fraction ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 07/13/15 04:00pm

    lacement 150,000 96, 000 160,000 214,000 5, 000 26 1 Street Li ht and Utility Services 10,000 10,000 27 ... in 23, 000 33,000 10, 000 Transfers out (443,000) (429,000) 14,000 Total other financing sources ... the Council entrance. 5: 02 PUBLIC FORUM PM 5: 07 COUNCIL REPORTS PM 5: 10 APPROVAL OF MINUTES PM ...

  10. Basic Wood Framing

    Community Development | Page

    1 1-8 1 1-5 2 2-2×6 2-11 2 2-7 2 2-3 2 2-2×8 3-9 2 3-3 2 2-11 3 2-2×10 4-7 3 4-0 3 3-6 3 2-2×12 5-4 ... 1-9 (1) 2-2X6 3-2 (2) 3-0 (2) 2-9 (2) 2-7 (2) 2-2X8 4-1 (2) 3-10 (2) 3-6 (2) 3-4 (2) 2-2X10 4-11 (2) ... NJ Span NJ Roof and ceiling 2-2×4 2-10 1 2-6 1 2-3 1 2-2×6 4-2 1 3-8 2 3-3 2 2-2×8 5-4 2 4-7 2 4-1 ...

Pages