Page not found

Search results

  1. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    4 – 5 Notes to Financial Statements 6 – 36 Required Supplementary Information Schedule of Proportionate Share ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  3. Decks

    Community Development | Page

    11 10 ½” DIAM. BOLT WITH 15/32” MAX. SHEATHING 36 36 34 29 24 21 19 ½” DIAM. BOLT / 15/32” MAX. ... 9 27 13 47 17 72 21 16 10 32 14 53 18 79 22 19 11 36 15 59 19 86 23 JOIST SPANS (Wet Service) (Source ... Redwood, Ponderosa Pine 2-2X6 5’5” 4’8” 4’2” 3’103’6” 3’1” 2’9” 2-2X8 6’10” 5’11” 5’4” 4’10” 4’6” 4’1” ...

  4. Data Request

    Police | Page

    a period of 10 business days from the date you are notified. Second request for reports, after failure to ... data. This should be done within 10 days after receiving the request. If the summary data cannot be ... prepared within 10 days, the Responsible Authority must notify the requestor of the anticipated time ...

  5. Basic Wood Framing

    Community Development | Page

    1-9 (1) 2-2X6 3-2 (2) 3-0 (2) 2-9 (2) 2-7 (2) 2-2X8 4-1 (2) 3-10 (2) 3-6 (2) 3-4 (2) 2-2X10 4-11 (2) ... 1 2-2×6 3-6 2 3-1 2 2-9 2 2-2×8 4-6 2 3-11 2 3-6 2 2-2×10 5-6 2 4-9 2 4-3 2 2-2×12 6-4 2 5-6 3 5-0 3 3-2×8 ... 1 1-8 1 1-5 2 2-2×6 2-11 2 2-7 2 2-3 2 2-2×8 3-9 2 3-3 2 2-11 3 2-2×10 4-7 3 4-0 3 3-6 3 2-2×12 5-4 ...

  6. Rental Housing Code

    Community Development | Page

    owner shall be required to register units within ten (10) days after acquiring them. Fee Schedule The ... residential -  $150/annual Multi-Unit Residential Buildings 3-6 units -  $200 per bldg/annual 7-10 units -  $300 ... application is received within 60 days, starting October 15, 2021. Other applicable fees as listed in the fee ...

  7. Rental Housing Code

    Community Development | Page

    owner shall be required to register units within ten (10) days after acquiring them. Fee Schedule The ... residential -  $150/annual Multi-Unit Residential Buildings 3-6 units -  $200 per bldg/annual 7-10 units -  $300 ... application is received within 60 days, starting October 15, 2021. Other applicable fees as listed in the fee ...

  8. 2022 Cost of Service Studies

    Public Utilities | Page

    OPERATING EXPENSES Purchased Power 10,991,941$ 11,169,489$ 11,336,920$ 11,069,792$ 13,611,143$ 11 ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 10,394,294 10,510,369 10,628,022 10,747,276 10,868,611 Rural residential 1,023,159 1,136,791 1,125,900 ...

  9. Waste Management

    Engineering / Public Works | Page

    Z 2023_wm_calender.pdf S M T W TH F S S M T W TH F S S M T W TH F S 1 2 3 4 1 2 3 4 1 2 3 4 5 6 7 5 6 7 8 9 10 11 ... 5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... F S S M T W TH F S S M T W TH F S 1 1 2 3 2 3 4 5 6 7 8 1 2 3 4 5 6 4 5 6 7 8 9 10 9 10 11 12 13 14 15 7 8 9 10 ...

  10. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    Groom, Recorder GREDA Regular Meeting 2 Thursday, February 28, 2019 DATE: 03/ 22/ 2019 TIME: 11: 08: 07 ... Meeting with Agenda and Minutes Thursday, March 28, 2019- 4:00pm Agenda Image Slideshow Display ... 2019 4: 00pm Grand Rapids City Hall NOTICE IS HEREBY GIVEN, that a regular meeting of the Grand Rapids ...

Pages