Page not found

Search results

  1. 2023 Electric Security Light Rates

    Public Utilities | Page

    $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ... – Existing Pole 4200 Lumens 40 Watt LED LAMPS – Separate Pole 6600 Lumens 70 Watt LED LAMPS – Existing Pole ... and replacement fixtures will be either 40 or 70 watt LED lamps. All other fixture types shall be ...

  2. Data Request

    Police | Page

    a period of 10 business days from the date you are notified. Second request for reports, after failure to ... signature notarized. Signed: Acknowledged before me on this________ day of_________, ... Data not on Individuals Meaning of Classification Public MS §13.02, subd. 15 Public MS §13.02, subd. 15 ...

  3. 2022 Cost of Service Studies

    Public Utilities | Page

    projected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... Mapping 81,756 67,602 57,115 34,139 47,363------ Small tools 31,520 22,379 15,027 17,833 30,801 28 ...

  4. 2023 City Water Rates

    Public Utilities | Page

    2" 3" 4" 6" Commodity Charges Rate $9.90 $13.80 $15.85 $17.76 $28.70 $108.70 $138.27 ... Gallons Next 22,000 Gallons All Gallons Over 30,000 City Commercial First 40,000 Gallons Next 360,000 ... Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ...

  5. Distributed Energy Resources

    Public Utilities | Page

    a. Uniform Contract (under 40kW capacity)  b. ... Municipal Minnesota Interconnection Agreement (over 40kW or upon customer request)  c. Certificate of Completion      Detroit Lakes Public Utility’s 29.3 kW Select Solar  ...   Unless otherwise stated, all time frames are measured in Business Days. For purpose of  measuring these time intervals, the time shall be computed so as to exclude the first  ...

  6. Permit Fee Calculator

    Community Development | Page

    $1.00- $500.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee $500.00 $23.50 $15.28 ... $0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ... $800.00 $34.25 $22.26 $0.40 $56.91 $2,001.00- $25,000.00 Project Cost Permit Fee Plan Review Fee State ...

  7. Public Utilities Financial Reports

    Public Utilities | Page

    effluent per day; 4.0 million gallons from UPM/Blandin Paper Company and 1.5 million gallons from domestic ... 2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... treatment facility capable of treating 3.24 million gallons of water per day. Water treatment consists of ...

  8. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... Carpet Replacement‐Third Floor 28 Library Upgrades 29‐34 Carpet Replacement‐Council Chambers 35 Central School Upgrades 36‐54 ... improvements described in the capital improvement plan. 1.02. Before the approval of the capital improvement ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 05/14/12 04:00pm

    Administrator CITYOF GRAND RAPIDS Page 1 Printed on 5H1/2012 C I TY O F G RAN D RAP I DS C40 NORTH AVE. GttANU ... 125,000 City Wide Overlays-Rural 2014l2013-2 1 40,000 40,000 21st St SW (3rd Ave to Horseshoe Lk Rd) ... 2 666,950 666,950 Elida Drive Extension 201'1012 2 243,876 243,876 City Wide Overtay-Urban 2012013-28 ...

  10. Footings, Foundations & Slabs

    Community Development | Page

    garage floor slabs 3,500c,d a. At 28 days psi. b. Concrete in these locations that may be subject to ... during the first 28 days. Strength of concrete also increases as the water-cement ratios decrease. While ... Mixtures Are Not Available Specified 28-day compressive strength, f’c psi Water-cement ratio by weight ...

Pages