Page not found

Search results

  1. Footings, Foundations & Slabs

    Community Development | Page

    @ 56” #6 @ 40” #6 @ 24” #4 @ 72” #4 @ 72” #5 @ 72” #6 @ 72” #6 @ 56” #6 @ 40” 10 feet 4 feet (or less) ... bottom surface may slope not to exceed 1 unit vertical to 10 units horizontal. Footings must be stepped ... footing will exceed a slope of more than 1:10 (R403.1.5). FOOTINGS ON OR ADJOINING SLOPES Special care ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... – Schedule of Expenses 55 Combined Schedule of Administrative, General and Customer Accounts Expense 56 ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ...

  3. Data Request

    Police | Page

    a period of 10 business days from the date you are notified. Second request for reports, after failure to ... data. This should be done within 10 days after receiving the request. If the summary data cannot be ... prepared within 10 days, the Responsible Authority must notify the requestor of the anticipated time ...

  4. Financial Reports

    Finance | Page

    Aurora Heights a $10.2M 56-unit affordable housing project were completed and were greeted with ... Funds Statement 9 46 Statement of Changes in Fiduciary Net Position- Fiduciary Funds Statement 10 47 ... Table 10 178 Ratios of General Bonded Debt Outstanding Table 11 179 Direct and Overlapping Governmental ...

  5. Sales Tax Fact Sheet

    Administration | Page

    County 1/1/2016 Ramsey County 10/1/2017 Rogers 10/1/2019 St. Louis County 4/1/2015 Sauk Centre 1/1/2020 ... Rogers Sales and Use Tax 10/1/19 0.25% Roseau County Transit Sales and Use Tax 1/1/22 0.5% St. Cloud ... to 1.0% (from 0.5%) effective 10/1/19. (7) Washington County Transit Sales and Use Tax increased to ...

  6. 2022 Cost of Service Studies

    Public Utilities | Page

    9,450 9,734 10,026 10,326 10,636 Locating Expense 48,000 50,400 51,912 53,469 55,073 56,726 Meters ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 10,394,294 10,510,369 10,628,022 10,747,276 10,868,611 Rural residential 1,023,159 1,136,791 1,125,900 ...

  7. City Council Regular Meeting

    City Council | Calendar Event | 01/13/14 04:00pm

    TOTALFLEETMAINTENANCE5,896.51 POLICE 0116610APPLIEDCONCEPTSINC117.56 12/10 ... TOTAL2011CIP/GAAPRONDESIGN477.86 8/10APRONDESIGN/GARECONST 2000425TKDA2,620.56 TOTAL8/10APRONDESIGN/GARECONST2,620.56 ... POLICE 0116610 APPLIED CONCEPTS INC 117. 56 12/ 10/ 13- 1/ 6/ 14 INVESTMENTS- 0- GRAND RAPIDS CITY ...

  8. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    Department 10,000 Library 26 000 IRA Civic Center 49,200 Blandin Beach Park 2,025 Grand Rapids Sports Complex ... the City of Grand Rapids has adopted and implemented 10 performance measures developed by the Council ... on Local Results and Innovation. Attachments: 2011 Survey Resuits.odf 10 Performance Measures ...

  9. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...

  10. Stormwater Credits Policy

    Engineering / Public Works | Page

    Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... Ordinance No. 17-05-03) Background On May 8, 2017, the Grand Rapids City Council approved a Stormwater ... 90 days of approval. No retroactive credits will be approved or applied to billings. Per section ...

Pages