Page not found

Search results

  1. Data Request

    Police | Page

    a period of 10 business days from the date you are notified. Second request for reports, after failure to ... data. This should be done within 10 days after receiving the request. If the summary data cannot be ... prepared within 10 days, the Responsible Authority must notify the requestor of the anticipated time ...

  2. 2023 Electric Security Light Rates

    Public Utilities | Page

    Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ...

  3. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... a. Uniform Contract (under 40kW capacity)  b. ...

  4. Grand Rapids Monitoring Results

    Public Utilities | Page

    This report contains our monitoring results from January 1 to December 31, 2020. We work with the ... Sources Nitrate 10 ppm 10.4 ppm 0.3 ppm N/A NO Runoff from fertilizer use; Leaching from septic tanks, ... Test Result Range of Detected Test Results Violation Typical Sources Fluoride 4.0 ppm 4.0 ppm 0.72 ppm ...

  5. Public Utilities Financial Reports

    Public Utilities | Page

    effluent per day; 4.0 million gallons from UPM/Blandin Paper Company and 1.5 million gallons from domestic ... 2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ...

  6. City Council Regular Meeting

    City Council | Calendar Event | 01/13/14 04:00pm

    /13-1/6/14INVESTMENTS-0- GRANDRAPIDSCITYCOUNCILBILLLIST-JANUARY13,2014 DATE:01/09/2014CITYOFGRANDRAPIDSPAGE:2 TIME:10:10:44DEPARTMENTSUMMARYREPORT ID:AP443000.CGR ... 12/10/13-1/6/14INVESTMENTS-0- GRANDRAPIDSCITYCOUNCILBILLLIST-JANUARY13,2014 DATE:01/09 ... /13-1/6/14INVESTMENTS-0- GRANDRAPIDSCITYCOUNCILBILLLIST-JANUARY13,2014 DATE:01/09/2014CITYOFGRANDRAPIDSPAGE:4 TIME:10:10:44DEPARTMENTSUMMARYREPORT ID:AP443000.CGR ...

  7. Community Development Fee Schedule

    Community Development | Page

    $96.50 Egress Windows (new) $40.30 $26.20 $1.00 $67.50 Residential Window Replacement (8-9-10) $60.00 ... (3-27-06) $54.85* $35.65 $1.00 $91.50 Emergency Number Sign (10-13-09) $50.00 each Comprehensive Plan ... $50,000.00 $391.65* for the first $25,000.00 plus $10.20* for each additional $1,000.00 or fraction thereof, ...

  8. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... voting on the question of issuance of the Bonds. Adopted this 10th day of May, 2021. Dale Christy, Mayor ... 1 2021/P&R-1 10,977,00010,977,000IRA Civic Center Improvements 1 2021/P&R-2 40,98440,984Forest Lake/YMCA ...

  9. 2022 Cost of Service Studies

    Public Utilities | Page

    projected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 10,394,294 10,510,369 10,628,022 10,747,276 10,868,611 Rural residential 1,023,159 1,136,791 1,125,900 ...

  10. Footings, Foundations & Slabs

    Community Development | Page

    @ 56” #6 @ 40” #6 @ 24” #4 @ 72” #4 @ 72” #5 @ 72” #6 @ 72” #6 @ 56” #6 @ 4010 feet 4 feet (or less) ... 5 feet 6 feet 7 feet 8 feet 9 feet 10 feet #4 @ 48” #4 @ 48” #4 @ 48” #5 @ 48” #6 @ 48” #6 @ 40” #6 @ 32” ... bottom surface may slope not to exceed 1 unit vertical to 10 units horizontal. Footings must be stepped ...

Pages