Page not found

Search results

  1. Data Request

    Police | Page

    Within 30 days, 7 Approved by the City Council on xx/xx/03 the Responsible Authority or designee must ... For licensees with service of less than thirty (30) days in a seasonal period less than six (6) months ... $200.00 full day event Lobby space $30.00 per hour (minimum 2 hours) Tables $9.00 each Chairs $1.00 each ...

  2. 2023 Electric Security Light Rates

    Public Utilities | Page

    Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ... – Existing Pole 4200 Lumens 40 Watt LED LAMPS – Separate Pole 6600 Lumens 70 Watt LED LAMPS – Existing Pole ...

  3. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28.00 ...

  4. Grand Rapids Monitoring Results

    Public Utilities | Page

    This report contains our monitoring results from January 1 to December 31, 2020. We work with the ... 4:30 p.m., Monday through Friday. Some contaminants are monitored regularly throughout the year, and ... Test Result Range of Detected Test Results Violation Typical Sources Fluoride 4.0 ppm 4.0 ppm 0.72 ppm ...

  5. Distributed Energy Resources

    Public Utilities | Page

    and include the last day of the prescribed duration of time. Any communication sent or  received after 4:30 ... a. Uniform Contract (under 40kW capacity)  b. ... Municipal Minnesota Interconnection Agreement (over 40kW or upon customer request)  c. Certificate of Completion      Detroit Lakes Public Utility’s 29.3 kW Select Solar  ...

  6. Public Utilities Financial Reports

    Public Utilities | Page

    effluent per day; 4.0 million gallons from UPM/Blandin Paper Company and 1.5 million gallons from domestic ... 2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... in northcentral Minnesota, and is the county seat of Itasca County. On March 30, 1910, the Grand ...

  7. Community Development Fee Schedule

    Community Development | Page

    ” high (non enclosed) Attached Steps/Deck (non enclosed) Covered porch (non enclosed) (2-9-15) $40.30 ... $96.50 Egress Windows (new) $40.30 $26.20 $1.00 $67.50 Residential Window Replacement (8-9-10) $60.00 ... $1.00 $61.00 Furnace Replacement (3-27-06) $40.30 $26.20 $1.00 $67.50 Water Heater/Softener $40.30 ...

  8. City Council Regular Meeting

    City Council | Calendar Event | 01/13/14 04:00pm

    0312104TONYCLAFTON40.00 0315454TRAVISCOLE14.70 0405305LYNNDEGRIO80.00 0405505JAMESDENNY5.09 ... .00 1315630ASHLEYMORAN40.00 1315654NATHANMORLAN11.30 1405435JEREMYNELSON80.00 1405850NEXTERACOMMUNICATIONSLLC475.80 ... TONY CLAFTON 40. 00 0315454 TRAVIS COLE 14. 70 0405305 LYNN DEGRIO 80. 00 0405505 JAMES DENNY 5. 09 ...

  9. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    is subject to expiration of the 30-day period without the City's receipt of a qualified petition ... 9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... percent (5%) of the votes cast in the last general election, is filed with City Clerk within thirty (30 ...

  10. 2022 Cost of Service Studies

    Public Utilities | Page

    projected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... Mapping 81,756 67,602 57,115 34,139 47,363------ Small tools 31,520 22,379 15,027 17,833 30,801 28,000 ...

Pages