Page not found

Search results

  1. Data Request

    Police | Page

    within 5 days Winter Parking Violation $15.00 or $25.00 if not paid within 5 days Alley Parking $15.00 or ... $25.00 if not paid within 5 days Over 24 hours (Subject to tow) $15.00 or $25.00 if not paid within ... 5 days No Parking Zone $15.00 or $25.00 if not paid within 5 days No Parking 2 – 6 AM $15.00 or $25.00 if ...

  2. 2022 Cost of Service Studies

    Public Utilities | Page

    90,339 Penalties 49,752 49,954 46,823 9,869 14,294------ Total Operating Revenues 15,849,263$ 15 ... examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... for GRPUC. In 2021 a new agreement was negotiated and signed with Minnesota Power. That contract went ...

  3. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    12/15/202112/15/2021 12/14/2022 12/14/2022 1/1/2023 $332.80 Next 80,000 gallons $5.25 80 Tier Rate (/1000) Next 20,000 ... Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ...

  4. Public Utilities Financial Reports

    Public Utilities | Page

    effluent per day; 4.0 million gallons from UPM/Blandin Paper Company and 1.5 million gallons from domestic ... position increased by $2,093,708 or 4.09%, from 2021 to 2022. An increase in total net position is based ... 2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ...

  5. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    1 Printed on 6/25/2012 powered by 1_egistar"”' CITY OF GRAND RAPIDS IY ll JfZf):\15 Legislation ... Meetinq 5:09 CONSENT AGENDA p.m. Any item on the consent agenda shall be removed for consideration by ... 8 COMMISSIONS p.m. 13. 12-0407 Acknowledge the attached minutes for Boards and Commissions. Attachments: Mav 15 ...

  6. 2023 Electric Security Light Rates

    Public Utilities | Page

    01/01/2023 Last Revised: Adopted 12/15/2021 Adopted 02/17/2021 Effective 04/01/2022 Effective 02/17/2021 ... $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ... Adopted 12/18/2019 Effective 09/01/2020 Table 1 ...

  7. Structural Engineers Reports

    Administration | Page

    changed / increased. 3. The required uniform snow load for this building is now 46 psf. (an increase of ... ridge. [Engineers Note: Measured, snow density measurements generally vary from 15 pcf to nearly 28 pcf ... which means that current 46 psf design load is approximately 2 to 3 feet of snow] 5. Under the current ...

  8. Distributed Energy Resources

    Public Utilities | Page

     ................................................................................................................... 8  4.6.  Changing ...  of Timelines .................................................................................................. 15  10.1.  Reasonable ...  Efforts ...................................................................................................... 15  10.2.  Extensions ...

  9. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ... 05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ...

  10. Sales Tax Fact Sheet

    Administration | Page

    January 1, 2022:  Roseau County has a 0.5% Transit Sales and Use Tax October 1, 2021:  Washington County ... Transit Sales and Use Tax increased to 0.5%  Mankato has a 3.0% Lodging Tax April 1, 2021:  Le Sueur ... rented under agreements for less than 29 days are subject to local tax if the lease agreement is entered ...

Pages