Page not found

Search results

  1. Temporary 1-4 Day Liquor License Sales & Service

    Administration | Page

    Statute 10A.14 State University Brewer who manufactures fewer than 3,500 barrels of malt liquor in a year ... Temporary licenses can be issued for: 1- 4 days, 12 days total per calendar year and not more than one event ... within a 30 day period Each license is for one location only Alcohol must remain on premise; patrols may ...

  2. Decks

    Community Development | Page

    22 10 56 16 106 22 26 11 63 17 116 23 32 12 71 18 126 24 37 13 79 19 137 25 Required footing sizes ... 11 10 ½” DIAM. BOLT WITH 15/32” MAX. SHEATHING 36 36 34 29 24 21 19 ½” DIAM. BOLT / 15/32” MAX. ... 2-2x12 2-2x12 3-2x10 10’ 2-2X6 2-2X6 2-2X6 2-2X6 2-2X8 2-2X8 2-2X10 2-2X10 2-2x12 3-2x10 3-2x10 11’ 2-2X6 ...

  3. Data Request

    Police | Page

    $0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ... a period of 10 business days from the date you are notified. Second request for reports, after failure to ... data. This should be done within 10 days after receiving the request. If the summary data cannot be ...

  4. Distributed Energy Resources

    Public Utilities | Page

    within ten (10) Business Days. This notification shall include a written list detailing all  information that must be provided to complete the Interconnection Application.  ... Depending on the process track the Interconnection Customer has between five (5) and  ten (10) Business Days ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...

  5. Footings, Foundations & Slabs

    Community Development | Page

    5 feet 6 feet 7 feet 8 feet 9 feet 10 feet #4 @ 48” #4 @ 48” #4 @ 48” #5 @ 48” #6 @ 48” #6 @ 40” #6 @ 32 ... bottom surface may slope not to exceed 1 unit vertical to 10 units horizontal. Footings must be stepped ... footing will exceed a slope of more than 1:10 (R403.1.5). FOOTINGS ON OR ADJOINING SLOPES Special care ...

  6. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ...

  7. 2022 Cost of Service Studies

    Public Utilities | Page

    Table 3-2 Cost of Service Results Comparison of Cost and Revenues 2021 Test Year Customer Classification ... examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... for GRPUC. In 2021 a new agreement was negotiated and signed with Minnesota Power. That contract went ...

  8. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    voting on the question of issuance of the Bonds. Adopted this 10th day of May, 2021. Dale Christy, Mayor ... CP 2021‐2, 5th St SW (10th Ave ‐ 11th Ave) 100 CP 2021‐3, Industrial Park Utility Extention 101 Year Project Starts: 2022 ... 1 2021/P&R-1 10,977,00010,977,000IRA Civic Center Improvements 1 2021/P&R-2 40,98440,984Forest Lake/YMCA ...

  9. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... over 210 8 $5.71 $3.99 $49.67 0 32 33 64 65 240 over 240 9 $5.71 $3.99 $55.38 0 36 37 72 73 270 over ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ...

  10. Basic Wood Framing

    Community Development | Page

    (2) 7-0 (2) 6-7 (2) 3-2X8 7-2 (1) 6-9 (1) 6-3 (1) 5-11 (2) 3-2X10 8-9 (1) 8-2 (1) 7-7 (2) 7-2 (2) ... 3-2X12 10-2 (2) 9-6 (2) 8-10 (2) 8-3 (2) 4-2X8 9-0 (1) 8-3 (1) 7-8 (1) 7-3 (1) 4-2X10 10-1 (1) 9-5 (1) ... 1-9 (1) 2-2X6 3-2 (2) 3-0 (2) 2-9 (2) 2-7 (2) 2-2X8 4-1 (2) 3-10 (2) 3-6 (2) 3-4 (2) 2-2X10 4-11 (2) ...

Pages