Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ... December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ...

  2. City Council Regular Meeting

    City Council | Calendar Event | 01/13/14 04:00pm

    1/13/20141/13/2014 Title: ConsiderapprovingtheverifiedclaimsfortheperiodDecember10, 2013toJanuary6, 2014inthe ... ConsiderapprovingtheverifiedclaimsfortheperiodDecember10, 2013toJanuary6, 2014inthetotalamountof 717,450.98. RequestedCityCouncilAction ... ConsiderapprovingtheverifiedclaimsfortheperiodDecember10, 2013toJanuary6, 2014inthetotalamountof 717,450.98. CITYOFGRANDRAPIDSPage1of1Printedon5/14/2021 ...

  3. 2022 Cost of Service Studies

    Public Utilities | Page

    OPERATING EXPENSES Purchased Power 10,991,941$ 11,169,489$ 11,336,920$ 11,069,792$ 13,611,143$ 11 ... the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ... projected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ...

  4. City Council Regular Meeting

    City Council | Calendar Event | 05/14/12 04:00pm

    125,000 City Wide Overlays-Rural 2014l2013-2 1 40,000 40,000 21st St SW (3rd Ave to Horseshoe Lk Rd) ... City Wide Overlays-Urban 20152014-38 1 94,000 94,000 2nd Ave SE (10th St-11th St) 201&2002-4 ... 482,119 4th Ave NE (5th St- 7th St) 2013/2012-3 2 316,342 316,342 10th Ave NE (5th St- 7th St) 20142011-1 ...

  5. 2023 Electric Security Light Rates

    Public Utilities | Page

    Z 2023_electric_security_light_rate_schedule.pdf Rate per Lamp Per Month GRAND RAPIDS PUBLIC UTILITIES COMMISSION Adopted 12/14/2022 ... Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ...

  6. Distributed Energy Resources

    Public Utilities | Page

    a. Uniform Contract (under 40kW capacity)  b. ... Municipal Minnesota Interconnection Agreement (over 40kW or upon customer request)  c. Certificate of Completion      Detroit Lakes Public Utility’s 29.3 kW Select Solar  ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...

  7. City Council Regular Meeting

    City Council | Calendar Event | 06/11/12 04:00pm

    citycouncil_agenda_2012-06-11.pdf Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings City Council ... agenda: 6/11/2012 Final action: Title: Request by the Police Department to apply for a 2013 & 2014 ... Meeting with Agenda and Minutes Monday, June 11, 2012- 4:00pm Work Session Agenda ...

  8. Islamic Practices & Muslim Community Guide

    Human Rights Commission | Page

    Islamic holy days and festivals follow the lunar calendar. Like the solar calendar, it has twelve months ... As a result, the lunar year is about 11 days shorter than the solar year. The month of Ramadan, the ... ninth month of the Islamic lunar calendar, is the time when Muslims are required to fast. Fasting during ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 07/13/15 04:00pm

    increase from 99.24% for 2013. The total special assessment collection rate increased Page 10 from 96. 57% ... citycouncil_agenda_2015-07-13.pdf Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings City Council ... the Council entrance. 5: 02 PUBLIC FORUM PM 5: 07 COUNCIL REPORTS PM 5: 10 APPROVAL OF MINUTES PM ...

  10. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... CP 2021‐2, 5th St SW (10th Ave ‐ 11th Ave) 100 CP 2021‐3, Industrial Park Utility Extention 101 Year Project Starts: 2022 ... CP 2015‐1, City Wide Overlays‐Sylvan 111 CP 2018‐3, 10th St NE (3rd Ave to CDS) 112 CP 2018‐4, 11th St NE (2nd Ave to 3rd Ave) 113 ...

Pages