Page not found

Search results

  1. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    a new permit requirement. Compliance with new requirements is required within 12 months after receiving ... requirements is required within 12 months after receiving permit coverage.) • 651-296-6300 • 800-657-3864 • Use ... 12 months after receiving permit coverage.) (Note: All or some of this item is a new permit ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    or 27.12%, and increases in domestic treatment of $51,569 or 9.32% along with increases in other ... expense of $1,813,215, or 13.32% and distribution of $167,523 or 12.63% are offset by increases in the ... December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ...

  3. 2022 Cost of Service Studies

    Public Utilities | Page

    29,400 30,282 31,190 32,126 33,090 Safety 21,887 18,731 12,098 29,396 30,613 17,000 17,850 18,386 18,937 ... GRPUC is billed monthly by MP based on the overall system peak. A 12 CP method, reflecting each class’ ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ...

  4. 2023 City Water Rates

    Public Utilities | Page

    Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... 2023 City Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact Info Block Web ... GRAND RAPIDS PUBLIC UTILITIES COMMISSION CITY WATER SERVICE RATE SCHEDULE Adopted: 12 ...

  5. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    9/12/2018 Effective 2/1/2022 10/1/2018 5/11/2022 9/12/2018 5/11/20224/21/2022 Revised Adopted ... 2023 City Multi-Family Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact ... Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ...

  6. Basic Wood Framing

    Community Development | Page

    3-2X12 10-2 (2) 9-6 (2) 8-10 (2) 8-3 (2) 4-2X8 9-0 (1) 8-3 (1) 7-8 (1) 7-3 (1) 4-2X10 10-1 (1) 9-5 (1) ... 1-9 (1) 2-2X6 3-2 (2) 3-0 (2) 2-9 (2) 2-7 (2) 2-2X8 4-1 (2) 3-10 (2) 3-6 (2) 3-4 (2) 2-2X10 4-11 (2) ... 4-7 (2) 4-3 (2) 4-1 (3) 2-2X12 5-9 (2) 5-5 (3) 5-0 (3) 4-9 (3) 3-2X8 5-1 (2) 4-9 (2) 4-5 (2) 4-2 (2) ...

  7. Complete 3.2 Beer Application

    Administration | Page

    of twelve (12) months from the date of signature. ... This authorization shall be valid for a period of twelve (12) months from the date of signature. ... 17: 18: 19: 20: 21: 22: 23: 24: 25: 26: 27: 28: 29: 30: 31: 32: 33: 34: 35: 36: 37: 38: 39: 40: 41: ...

  8. Complete Application Packet: Off-sale

    Administration | Page

    of twelve (12) months from the date of signature. ... This authorization shall be valid for a period of twelve (12) months from the date of signature. ... 23: 24: 25: 26: 27: 28: 29: 30: 31: 32: 33: 34: 35: 36: 37: 38: 39: 40: 41: 42: 43: 44: 45: 46: 47: ...

  9. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    /15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 2023 Wastewater Collection & Treatment Rate Schedule- City- Adopted 12/14/2022 2023 Wastewater ...

  10. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 04/26/18 04:00pm

    referred to as " Lessee", entered into this 12th day of April, 2018. ARTICLE 1- LEASED PREMISES ... exclude common areas, exterior grounds and space not rented. 3. 2 Calendar year 2018 base rent shall be in ... 1sT day of June, 2018 and continuing on the first day of each month thereafter through December 31, ...

Pages