Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    House – Schedule of Expenses 53 Sludge Disposal – Schedule of Expenses 54 Secondary Treatment Facility ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  2. 2023 City Electric Interim Annexation Areas Service Rate Schedule

    Public Utilities | Page

    RATE SCHEDULE Customer Charge (per month) RESIDENTIAL $ 10.40 COMMERCIAL $ 19.55 Adopted: ... (PPA) CLAUSE There shall be added to from the monthly electric service billing, a Purchased Power ... 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ...

  3. 2023 City Electric Service Rate Schedule

    Public Utilities | Page

    LIGHTING INDUSTRIAL $ $ $ $ $ Customer Charge (per month) 10.40 19.55 28.00 12.75 12.50 Adopted: ... Adopted 12/18/2019 Effective 05/01/2021 ... PURCHASED POWER ADJUSTMENT (PPA) CLAUSE There shall be added to from the monthly electric service billing, ...

  4. 2023 Electric Vehicle Service Rate Schedule

    Public Utilities | Page

    After: Customer Energy Charge Charge (per month) 4.15 26.25 existing or standalone charqe existing or All ... Charge Customer Charge On Peak Hours: 8:00 a.m. to 10:00 p.m. Monday- Friday PURCHASED POWER ADJUSTMENT ... (PPA) CLAUSE There shall be added to from the monthly electric service billing, a Purchased Power ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    approximately 5.4% from 2022. There are some additional small changes recommended for certain rates as detailed ... the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ...

  6. Utility Information

    Engineering / Public Works | Page

    year is as follows: 2023: Single Family $8.75 per month. Multi-Family $31.98 per acre per month ... . Commercial $48.98 per acre per month. Industrial $48.98 per acre per month. Institutional $43.44 per acre per month ... Practices Credit Policy (As per Section 70-203(b) of Ordinance No. 17-05-03) Background On May 8, 2017, the ...

  7. Stormwater Credits Policy

    Engineering / Public Works | Page

    Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... Ordinance No. 17-05-03) Background On May 8, 2017, the Grand Rapids City Council approved a Stormwater ... a determination of the credit once per calendar year. If the credit is approved, the credit will be applied within ...

  8. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28.00 ... shall be added to from the monthly electric service billing, a Purchased Power Adjustment or PPA ...

  9. Islamic Practices & Muslim Community Guide

    Human Rights Commission | Page

    Islamic holy days and festivals follow the lunar calendar. Like the solar calendar, it has twelve months ... ninth month of the Islamic lunar calendar, is the time when Muslims are required to fast. Fasting during ... month of Ramadan, the ninth month of the Islamic lunar calendar, is the period in which Muslims are ...

  10. 2023 Load Management Electric Service Rate Schedule

    Public Utilities | Page

    12/18/2019 Effective 05/01/2021 June-September @ customer's normal electric customer charge ... Monthly Credit o�3 Ton Air G:onditi0ning Unit Monthly G:redit 4-6 Ton Air €onditio.ning Unit ... $ $ $ $ $ $ '$ $ 2023 LOAD MANAGEMENT ELECTRIC SERVICE RATE SCHEDULE customer Charge (per month) (5.00) (2.50) ...

Pages