Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ... economy. Recent annexations have increased the City’s population from 8,543 in 2005 to 11,283 in 2022. ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ...

  2. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ... OPERATING EXPENSES Purchased Power 10,991,941$ 11,169,489$ 11,336,920$ 11,069,792$ 13,611,143$ 11 ...

  3. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17.00 $20.00 $25.00 $35.00 $50.00 Commodity ... Charges Charges calculated are per month Meter Size 5/8"-3/4" 1" 1 ¼" 1 ½" ... Charges Charges calculated are per 1000 gallons per month Residential All Gallons Commercial/Industrial ...

  4. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... Transmittal 3 Certificate of Achievement 9 Principal City Officials and Department Heads 11 Organization Chart ... General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ...

  5. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...  Terminology .................................................................................................................. 2  1.1.  Distributed ...  Agent ............................................................................................................. 3  2.5.  Engineering ...

  6. Complete Application Packet: Off-sale

    Administration | Page

    23: 24: 25: 26: 27: 28: 29: 30: 31: 32: 33: 34: 35: 36: 37: 38: 39: 40: 41: 42: 43: 44: 45: 46: 47: ... of twelve (12) months from the date of signature. ... This authorization shall be valid for a period of twelve (12) months from the date of signature. ...

  7. 2023 Electric Vehicle Service Rate Schedule

    Public Utilities | Page

    After: Customer Energy Charge Charge (per month) 4.15 26.25 existing or standalone charqe existing or All ... (PPA) CLAUSE There shall be added to from the monthly electric service billing, a Purchased Power ... 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ...

  8. Permit Fee Calculator

    Community Development | Page

    $0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ... review 25% plan review fee: $920.54 $7,085.39 $2,000,001.00- $3,000,000.00 Project Cost Permit Fee Plan ... $31,835.00 State did plan review 25% plan review fee: $2,987.54 $22,872.39 $5,000,001.00 AND OVER Project ...

  9. Basic Wood Framing

    Community Development | Page

    (JACK STUDS) One floor only 2-2X4 3-1 (1) 2-11 (1) 2-8 (1) 2-7 (1) 2-2X6 4-6 (1) 4-3 (1) 3-11 (1) 3-9 ... 2 3-3 2 2-11 2 2-2×8 4-9 2 4-2 2 3-9 2 2-2×10 5-9 2 5-1 2 4-7 3 2-2×12 6-8 2 5-10 3 5-3 3 3-2×8 5-11 ... 1 1-8 1 1-5 2 2-2×6 2-11 2 2-7 2 2-3 2 2-2×8 3-9 2 3-3 2 2-11 3 2-2×10 4-7 3 4-0 3 3-6 3 2-2×12 5-4 ...

  10. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    citycouncil_agenda_2012-06-25.pdf Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings City Council ... Fuli Detail I I!.ilt_\C1,4 t;..11.i: City Council Work Session Monday, June 25, 2012 4:00 PM Conference ... Meeting with Agenda and Minutes Monday, June 25, 2012- 4:00pm Work Session Agenda ...

Pages