Page not found
Search results
-
Public Utilities Financial Reports
Public Utilities | PageSchedule of Changes in Utility Plant 57 Schedule of Changes in Accumulated Depreciation 58 Schedule of ... December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ... iron distribution mains consisting mostly of 6”, 8” and 12” pipe. The GRPUC is responsible for the ...
-
2023 Wastewater Collection & Treatment Rate Schedule
Public Utilities | Page/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... $20.00 $25.00 $35.00 $50.00 Commercial/Industrial All Gallons $5.45 Revised: Adopted 12/14/2022 Effective ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ...
-
2022 Cost of Service Studies
Public Utilities | Page19,505 20,090 Seminar/training 41,493 12,554 12,617 11,590 11,401 12,000 12,600 12,978 13,367 13,768 ... Other 43,995 12,127 57,645 7,031 5,922------ Total Distribution Expenses 999,552$ 759,727$ 1,015,553$ ... GRPUC is billed monthly by MP based on the overall system peak. A 12 CP method, reflecting each class’ ...
-
2023 Rural Electric Service Rate Schedule
Public Utilities | PageNature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28.00 ... /14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ... 05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ...
-
Distributed Energy Resources
Public Utilities | PageRapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Simplified Process (under 20kW capacity) c. Fast Track Process (see applicability within) d. Study Process (see applicability within) 2. ... Energy Resource ............................................................................................ 2 1.2. Point of Common Coupling (PCC) / Point of DER Connection (POC) ............................... 2 ...
-
Financial Reports
Finance | Page2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ... Expenditures and Changes in Fund Balance- Nonmajor Governmental Funds Statement 20 119 Subcombining Balance ...
-
MPCA MS4 Permit Public Notice Copy
Engineering / Public Works | Pagea new permit requirement. Compliance with new requirements is required within 12 months after receiving ... requirements is required within 12 months after receiving permit coverage.) • 651-296-6300 • 800-657-3864 • Use ... 12 months after receiving permit coverage.) (Note: All or some of this item is a new permit ...
-
Community Development Fee Schedule
Community Development | Pagethereof, to and including $2,000.00 $2,001.00- $25,000.00 $70.00 * for the first $2,000.00 plus $14.20* for ... $50,000.00 $391.65* for the first $25,000.00 plus $10.20* for each additional $1,000.00 or fraction thereof, ... to and including $50,000.00 $50,001.00 to $100,000.00 $650.20* for the first $50,000.00 plus $7.10* ...
-
City Council Regular Meeting
City Council | Calendar Event | 06/25/12 04:00pmschedule 12 5:20 COMMUNITY DEVELOPMENT p.m. 15. 12-0397 Consider adoption of a resolution issuing an order ... Attachments: Foust Vacation Resolution- 6-25-12 Recess regular meeting for 2nd scheduled public hearing. 20 ... 12-57 by consent roll call 15. Appointment of Michael Liebel to the position of 2nd Assistant Fire Chief ...
-
Complete Application Packet: Off-sale
Administration | Pageof twelve (12) months from the date of signature. ... This authorization shall be valid for a period of twelve (12) months from the date of signature. ... Check Box37: Check Box38: 1: 2: 3: 4: 5: 6: 7: 8: 9: 10: 11: 12: 13: 14: 15: 16: 17: 18: 19: 20: 21: 22: ...