  1. Public Utilities Financial Reports

    Public Utilities | Page

    December 31, 2029. The agreement includes a flat customer charge per month, a predetermined yearly base ... iron distribution mains consisting mostly of 6”, 8” and 12” pipe. The GRPUC is responsible for the ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ...

  2. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    /15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... $20.00 $25.00 $35.00 $50.00 Commercial/Industrial All Gallons $5.45 Revised: Adopted 12/14/2022 Effective ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ...

  3. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... GRPUC is billed monthly by MP based on the overall system peak. A 12 CP method, reflecting each class’ ... Electric Cost of Service Study- Adopted 12/14/2022 Water Cost of Service Study- Adopted 12 ...

  4. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28 ... /14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ... 05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ...

  5. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...  Energy Resource ............................................................................................ 2  1.2.  Point of Common Coupling (PCC) / Point of DER Connection (POC) ............................... 2  ...  Agent ............................................................................................................. 3  2.5.  Engineering ...

  6. 2023 City Water Rates

    Public Utilities | Page

    Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... 2023 City Water Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact Info Block Web ... GRAND RAPIDS PUBLIC UTILITIES COMMISSION CITY WATER SERVICE RATE SCHEDULE Adopted: 12 ...

  7. 2023 City Electric Service Rate Schedule

    Public Utilities | Page

    LIGHTING INDUSTRIAL $ $ $ $ $ Customer Charge (per month) 10.40 19.55 28.00 12.75 12.50 Adopted: ... Adopted 12/18/2019 Effective 05/01/2021 ... 2023 City Electric Service Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact Info ...

  8. 2023 Electric Vehicle Service Rate Schedule

    Public Utilities | Page

    After: Customer Energy Charge Charge (per month) 4.15 26.25 existing or standalone charqe existing or All ... 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ... 2023 Electric Vehicle Rate Schedule- Adopted 12/14/2022 Image Slideshow Display Contact Info Block ...

  9. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    Meeting with Agenda and Minutes Thursday, March 28, 2019- 4:00pm Agenda Image Slideshow Display ... Pokegama Avenue, in Grand Rapids, Minnesota on Thursday, March 28, 2019 at 4:00pm. AGENDA 1. Call to Order ... Approval ofminutes from the February 28, 2019 regular meeting. 5. Consider approval of claims 6. IEDC ...

  10. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ... Capital Project Funds Statement 25 138 Subcombining Statement of Revenues, Expenditures and Changes in ...