Page not found

Search results

  1. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... Charges Charges calculated are per month Meter Size 5/8"-3/4" 1" 1 ¼" 1 ½" ... 2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17.00 $20.00 $25.00 $35.00 $50.00 Commodity ...

  2. 2023 Electric Security Light Rates

    Public Utilities | Page

    01/01/2023 Last Revised: Adopted 12/15/2021 Adopted 02/17/2021 Effective 04/01/2022 Effective 02 ... Z 2023_electric_security_light_rate_schedule.pdf Rate per Lamp Per Month GRAND RAPIDS PUBLIC UTILITIES COMMISSION Adopted 12/14/2022 ... $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... Expenses 44 – 45 Water Department – Detailed Schedule of Revenues and Expenses 46 – 47 Wastewater ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ...

  4. Data Request

    Police | Page

    Data not on Individuals Meaning of Classification Public MS §13.02, subd. 15 Public MS §13.02, subd. 15 ... BUILDING Monthly Rental Fees Garden Level $11.02 * 1st Floor $11.97 * 2nd Floor $11.49 * 3rd Floor $ 8.58 ... $0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ...

  5. 2023 City Water Rates

    Public Utilities | Page

    Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... Charges Charges calculated are per month Meter Size 5/8"-3/4" 1" 1 ¼" 1 ½" ... 2" 3" 4" 6" Commodity Charges Rate $9.90 $13.80 $15.85 $17.76 $28.70 $108.70 $138.27 ...

  6. 2022 Cost of Service Studies

    Public Utilities | Page

    the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ... Operating Expenses (15,133,717) (16,471,822) (17,535,707) (18,642,543) (19,600,947) (20,298,209) Less ... 2,852,105 931,335 396,769 (174,823) (583,744) (739,557) Net Income as Percent of Revenues 15.0% 5.0% ...

  7. Financial Reports

    Finance | Page

    time surviving through the winter months. the current opinion of cost for the project is $15.5 million. ... 7 44 Statement of Cash Flows- Proprietary Funds Statement 8 45 Statement of Net Position- Fiduciary ... 15 107 Schedule of Pension Contributions- Public Employees Police and Fire Fund Statement 16 108 ...

  8. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... Beacon Relocation 13 Airfield Lighting Replacement 14 FBO Improvements 15 Airport Zoning Update 16 Buildings Five ... CP 2003‐18, 21st St SW (3rd Ave ‐ Horseshoe Lk Rd 104 CP 2016‐1, 6th Ave (4‐5th St) NW Street Reconstruction 105 CP 2018‐1, Block 19 Improvements ...

  9. Islamic Practices & Muslim Community Guide

    Human Rights Commission | Page

    Islamic holy days and festivals follow the lunar calendar. Like the solar calendar, it has twelve months ... ninth month of the Islamic lunar calendar, is the time when Muslims are required to fast. Fasting during ... month of Ramadan, the ninth month of the Islamic lunar calendar, is the period in which Muslims are ...

  10. Permit Fee Calculator

    Community Development | Page

    $1.00- $500.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee $500.00 $23.50 $15 ... .28 $0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ... $15.00 $745.37 Similar Plans 25% Plan Review Fee $110.66 $568.31 $50,001.00- $100,000.00 Project Cost ...

Pages