Page not found

Search results

  1. 2022 Cost of Service Studies

    Public Utilities | Page

    examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... the monthly wholesale bills from Minnesota Power. These adjustments are outside GRPUC’s control and ... for GRPUC. In 2021 a new agreement was negotiated and signed with Minnesota Power. That contract went ...

  2. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    CP 2021‐2, 5th St SW (10th Ave ‐ 11th Ave) 100 CP 2021‐3, Industrial Park Utility Extention 101 Year Project Starts: 2022 ... voting on the question of issuance of the Bonds. Adopted this 10th day of May, 2021. Dale Christy, Mayor ... 3 2021/AP-1 170,000170,000Beacon Relocation 1 2022/AP-1 20,00020,000Airfield Lighting Replacement 3 2022/AP-2 ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    Information 38 – 41 Supplementary Information 2022 Combining Schedules of Revenues and Expenses 42 2021 ... residential, commercial, and industrial customer sales. Overall, kWh sales were up 2.42% from 2021. Water ... Investment income (loss) (86,061) 20,730 30,745 (106,791) (10,015) Demand interest payments 470,362 445,886 ...

  4. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 04/26/18 04:00pm

    18% Hometown Community Bank 10,756,000.00 10,718,000.00 13, 022, 000. 00 18% Kensington Bank 42, 633, ... Contact Info Block Web Page Calendar Event Menu Settings Economic Development Authority Regular Meeting ... Sawmill Inn site. 10. Updates: a. 11. Adjourn GREDA Members/ terms: Dale Christy— 12/ 31/ 18 (with council ...

  5. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... number of permits issued, the 2021 total of 526 permits was below the 10 year average of 550. We expect ... blank- 10 GRAND RAPIDS, CITY OF PRINCIPAL CITY OFFICIALS AND DEPARTMENT HEADS December 31, 2021 Term ...

  6. MPCA MS4 Permit Public Notice Copy

    Engineering / Public Works | Page

    formats https://www.pca.state.mn.us wq-strm4-49a • 9/ /20 Page 1 of 32 MS4 Part 2 Permit Application ... wq-strm4-49a • 9/ /20 Page 2 of 32 I certify under penalty of law that this document and all attachments were ... wq-strm4-49a • 9/ /20 Page 3 of 32 MCM 1: Public education and outreach (Note: All or some of this item is ...

  7. Basic Wood Framing

    Community Development | Page

    9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ... 1 2-0 1 1-9 1 2-2×6 3-5 2 3-0 2 2-8 2 2-2×8 4-4 2 3-9 2 3-5 2 2-2×10 5-3 2 4-7 3 4-2 3 2-2×12 6-1 2 5-4 ... — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ...

  8. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    $5.71 $3.99 $238.10 0 164 165 328 329 1,230 over 1,230 42 $5.71 $3.99 $243.81 0 168 169 336 337 1,260 ... 12/15/202112/15/2021 12/14/2022 12/14/2022 1/1/2023 $332.80 Next 80,000 gallons $5.25 80 Tier Rate (/1000) Next 20 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ...

  9. Islamic Practices & Muslim Community Guide

    Human Rights Commission | Page

    Islamic holy days and festivals follow the lunar calendar. Like the solar calendar, it has twelve months ... ninth month of the Islamic lunar calendar, is the time when Muslims are required to fast. Fasting during ... month of Ramadan, the ninth month of the Islamic lunar calendar, is the period in which Muslims are ...

  10. Distributed Energy Resources

    Public Utilities | Page

    Simplified Process (under 20kW capacity)  c. Fast Track Process (see applicability within)  d. Study Process (see applicability within)  2. ... Information for interconnecting all  Distributed Energy Resources smaller than  10 ...  .......................................................................................................................... 6  4.2.  Availability ...

Pages