Page not found
Search results
-
2023 Wastewater Collection & Treatment Rate Schedule
Public Utilities | PageEffective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... $20.00 $25.00 $35.00 $50.00 Commercial/Industrial All Gallons $5.45 Revised: Adopted 12/14/2022 Effective ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ...
-
Public Utilities Financial Reports
Public Utilities | PageExpenses 44 – 45 Water Department – Detailed Schedule of Revenues and Expenses 46 – 47 Wastewater ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ... in over a decade. In 2019, when GRPUC conducted the electric utility study, the AMI and AMR water ...
-
Distributed Energy Resources
Public Utilities | PageRapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Simplified Process (under 20kW capacity) c. Fast Track Process (see applicability within) d. Study Process (see applicability within) 2. ... Review Timelines .......................................................................................... 7 4.5. Comparability ...
-
2021-2025 Amended Capital Improvement Plan
Finance | PageFund 20,000 20,000 2023/P&R-2 90,00090,000Blandin Beach Restrooms 3 CIP Fund 45,000 45 ... Blandin Beach House Demo 20 Blandin Beach Restrooms 21 Blandin Beach Pavilion 22 New Fire Hall/Police Evidence 23 Building ... CP 2003‐18, 21st St SW (3rd Ave ‐ Horseshoe Lk Rd 104 CP 2016‐1, 6th Ave (4‐5th St) NW Street Reconstruction 105 CP 2018‐1, Block 19 Improvements ...
-
Data Request
Police | PageCharges Imposed on Requests Exceeding Cost of $20.00 Hourly Rate (charged by 1/4 hour) $20.00 911 Call ... * Not subject to the $20.00 excess rule. $1.00 1st Page- $0.10 each additional page Data Request Form ... 20___.________________________________ NOTARY PUBLIC C. Completed by Department Department Name: Handled By: Information Classified as:- ...
-
Permit Fee Calculator
Community Development | Page$0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ... Permit Fee Plan Review Fee State Surcharge Total Fee $100,000.00 $1,005.20 $653.38 $50.00 $1,708.58 ... Similar plans 25% of permit fee $300.45 $1,569.75 $500,001.00- $1,000,000.00 Project Cost Permit Fee Plan ...
-
Financial Reports
Finance | Page2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... 7 44 Statement of Cash Flows- Proprietary Funds Statement 8 45 Statement of Net Position- Fiduciary ... Expenditures and Changes in Fund Balance- Nonmajor Governmental Funds Statement 20 119 Subcombining Balance ...
-
Kill A Watt Meter
Grand Rapids Area Library | Pagea 2-week loan from the library at 140 NE 2nd Street, Grand Rapids. To reserve a Kill A Watt meter, call the ... cumulative kilowatt-hours of energy usage, and displays volts, amps, and watts at a 0.2% accuracy rating. ...
-
Waste Management
Engineering / Public Works | Page5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ... 11 12 13 11 12 13 14 15 16 17 16 17 18 19 20 21 22 14 15 16 17 18 19 20 18 19 20 21 22 23 24 23 24 25 ...
-
2022 Cost of Service Studies
Public Utilities | Page2027 Operating Revenues $19,061,765 $18,448,198 $18,977,138 $19,515,558 $20,064,303 $20,624,106 Less ... Operating Expenses (15,133,717) (16,471,822) (17,535,707) (18,642,543) (19,600,947) (20,298,209) Less ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ...