Page not found

Search results

  1. 2023 City Water Rates

    Public Utilities | Page

    Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... 2" 3" 4" 6" Commodity Charges Rate $9.90 $13.80 $15.85 $17.76 $28.70 $108.70 $138.27 ...

  2. Temporary 3.2 Beer Sales and Service

    Administration | Page

    temporary license. City Ordinance 35.02(d)(e) I hereby apply for a temporary permit to dispense on-sale 3.2 ... Minnesota statute 340A.403, subd. 2, paragraph (a) allows cities to issue on-sale 3.2 malt liquor ... organization are eligible.   temporary 3.2 beer licenses are available to: Club or Charitable Organizations ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ... in over a decade. In 2019, when GRPUC conducted the electric utility study, the AMI and AMR water ... Updated the electric cost of service rate study originally developed in 2019. > Energized the community ...

  4. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... Mapping 81,756 67,602 57,115 34,139 47,363------ Small tools 31,520 22,379 15,027 17,833 30,801 28 ... ,000 29,400 30,282 31,190 32,126 33,090 Safety 21,887 18,731 12,098 29,396 30,613 17,000 17,850 18,386 18,937 ...

  5. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...  .......................................................................................................................... 3  3.2.  Importance ... interconnection is moved into a different track, additional information may be  requested and additional fees may apply.     3.2. Importance of Process Timelines  ...

  6. Basic Wood Framing

    Community Development | Page

    SUPPORTING SIZE BUILDING WIDTH (FT) 20 24 28 32 SPAN (JACK STUDS) SPAN (JACK STUDS) SPAN (JACK STUDS) SPAN ... attic assembly supported by 2 × 4 studs is limited to a roof span of 32 feet. Where the roof span ... exceeds 32 feet, the wall studs shall be increased to 2 × 6 or the studs shall be designed in accordance ...

  7. Kill A Watt Meter

    Grand Rapids Area Library | Page

    a 2-week loan from the library at 140 NE 2nd Street, Grand Rapids. To reserve a Kill A Watt meter, call the ... cumulative kilowatt-hours of energy usage, and displays volts, amps, and watts at a 0.2% accuracy rating. ...

  8. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ...

  9. Waste Management

    Engineering / Public Works | Page

    23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ... 26 27 28 29 21 22 23 24 25 26 27 25 26 27 28 29 30 30 28 29* 30 31 S M T W TH F S S M T W TH ... 14 15 16 16 17 18 19 20 21 22 13 14 15 16 17 18 19 17 18 19 20 21 22 23 23 24 25 26 27 28 29 20 21 22 ...

  10. Financial Reports

    Finance | Page

    Central School Statement 28 145 Airport Operations Statement 29 146 IRA Civic Center Statement 30 147 ... Haz-Mat Statement 31 148 Police Forfeiture Statement 32 149 Cemetery Statement 33 150 Domestic Animal ... evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ...

Pages