Page not found

Search results

  1. 2023 Electric Security Light Rates

    Public Utilities | Page

    Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ... – Existing Pole 4200 Lumens 40 Watt LED LAMPS – Separate Pole 6600 Lumens 70 Watt LED LAMPS – Existing Pole ...

  2. 2023 City Water Rates

    Public Utilities | Page

    Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... Gallons Next 22,000 Gallons All Gallons Over 30,000 City Commercial First 40,000 Gallons Next 360,000 ...

  3. Community Development Fee Schedule

    Community Development | Page

    Door (12-17-12) $40.00 $1.00 $41.00 Siding Replacement (3-27-06) $60.00 $1.00 $61.00 All Regulated ... $1.00 $61.00 Furnace Replacement (3-27-06) $40.30 $26.20 $1.00 $67.50 Water Heater/Softener $40 ... Commercial Demolitions (3-27-06) $40.00* $1.00 $41.00 Fireplaces & free standing stoves (Gas or Wood) ...

  4. Data Request

    Police | Page

    Data not on Individuals Meaning of Classification Public MS §13.02, subd. 15 Public MS §13.02, subd. 15 ... Public MS §13.02, subd. 4 Available to anyone for any reason Private MS §13.02, subd. 12 Private MS ... §13.10, subd. 1B Nonpublic MS §13.02, subd. 9 Available only to the data subject and to anyone authorized ...

  5. 2022 Cost of Service Studies

    Public Utilities | Page

    projected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 2-A 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Historical Projected Grand Rapids Public ...

  6. Maintenance Workers – Seasonal/Temporary

    Engineering / Public Works | Job Opening

    conditions.  Applicants should be available to work up to 40 hours per week, Monday – Friday, with some ...

  7. Kill A Watt Meter

    Grand Rapids Area Library | Page

    a 2-week loan from the library at 140 NE 2nd Street, Grand Rapids. To reserve a Kill A Watt meter, call the ... cumulative kilowatt-hours of energy usage, and displays volts, amps, and watts at a 0.2% accuracy rating. ...

  8. Public Utilities Financial Reports

    Public Utilities | Page

    effluent per day; 4.0 million gallons from UPM/Blandin Paper Company and 1.5 million gallons from domestic ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ... in over a decade. In 2019, when GRPUC conducted the electric utility study, the AMI and AMR water ...

  9. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ...

  10. Permit Fee Calculator

    Community Development | Page

    $0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ... $800.00 $34.25 $22.26 $0.40 $56.91 $2,001.00- $25,000.00 Project Cost Permit Fee Plan Review Fee State ... Surcharge Total Fee $4,000.00 $98.40 $63.96 $2.00 $164.36 No Plan Review Total $100.40 $25,001.00- ...

Pages