  1. 2023 Electric Security Light Rates

    Public Utilities | Page

    – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ... Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ...

  2. Waste Management

    Engineering / Public Works | Page

    23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ... 11 12 13 11 12 13 14 15 16 17 16 17 18 19 20 21 22 14 15 16 17 18 19 20 18 19 20 21 22 23 24 23 24 25 ... 26 27 28 29 21 22 23 24 25 26 27 25 26 27 28 29 30 30 28 29* 30 31 S M T W TH F S S M T W TH ...

  3. Public Utilities Financial Reports

    Public Utilities | Page

    a cost of $2.3 million dollars, and financed through reserves. The Tioga 115 kV to 22.9 kV substation was ... to 22.9 kV for distribution to 6 major substations, 5 rural step-down stations, or directly ... transformed to consumer applicable voltages. The main 115 kV to 22.9 kV substation was constructed in 2005 at ...

  4. Electric Distribution

    Public Utilities | Page

    kV to 22.9 kV substation was constructed in 2005 at the cost of $2.3 million dollars and financed ... September 1, 2015. In addition, beginning in 2019, the generation capacity charge for each year is based on ... previous year’s charge. Power is received at 115 kV and transformed to 22.9 kV for distribution to 6 major ...

  5. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    over 630 22 $5.71 $3.99 $129.61 0 88 89 176 177 660 over 660 23 $5.71 $3.99 $135.32 0 92 93 184 185 690 ... Z 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ...

  6. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... 71,303 Overhead lines 139,379 122,630 177,900 174,777 236,987 22,000 23,100 23,793 24,507 25,242 25,999 ... contract with MP which became effective 1/1/22 has a significant impact on the overall results. An overall ...

  7. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...  .......................................................................................................................... 2  2.2.  DER ...  Interconnection Coordinator .................................................................................... 3  2.3.  Interconnection ...

  8. Economic Development Authority Meeting

    Economic Development Authority | Calendar Event | 09/23/21 04:00pm

    Meeting with Agenda and Minutes Thursday, September 23, 2021- 4:00pm Agenda Minutes Video Image ... GRAPIDSMN crivers@agendapal.com 387951de-aca8-4ceb-a09f-6ea1dd345e38 Sort A to Z Agenda (HTML) Agenda Packet ...

  9. City Council Regular Meeting

    City Council | Calendar Event | 05/14/12 04:00pm

    General Fund Golf Course Road Improvements 2013/2011-5 2 214,500 214,500 Wednesday, Moy 09, 20l2 Sou ... 2 176,600 176,600 4th Ave NE (5th St- 7th St) 2013i2012-3 2 111,600 111,600 Wednesdav, May 09, 10/2 Source ... 09, 1012 City of Grand Rapids, Minnesota Amended Capital Improvement Plan 2012 thru 2016 PROJECTS ...

  10. Financial Reports

    Finance | Page

    2020 Assets: Current and other assets $22,028,726 $23,219,060 $752,040 $394,602 $22,780,766 $23 ... Analysis 23 Basic Financial Statements: Government-Wide Financial Statements: Statement of Net Position ... and Changes in Fund Balance- Nonmajor Special Revenue Funds Statement 22 124 Subcombining Balance ...