Page not found

Search results

  1. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28 ... Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ...

  2. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    150 over 150 6 $5.71 $3.99 $38.25 0 24 25 48 49 180 over 180 7 $5.71 $3.99 $43.96 0 28 29 56 57 210 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... 216 217 810 over 810 28 $5.71 $3.99 $163.87 0 112 113 224 225 840 over 840 29 $5.71 $3.99 $169.58 ...

  3. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... Mapping 81,756 67,602 57,115 34,139 47,363------ Small tools 31,520 22,379 15,027 17,833 30,801 28 ... 2-A 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Historical Projected Grand Rapids Public ...

  4. Public Utilities Financial Reports

    Public Utilities | Page

    electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ... in over a decade. In 2019, when GRPUC conducted the electric utility study, the AMI and AMR water ... Updated the electric cost of service rate study originally developed in 2019. > Energized the community ...

  5. Basic Wood Framing

    Community Development | Page

    (JACK STUDS) One floor only 2-2X4 3-1 (1) 2-11 (1) 2-8 (1) 2-7 (1) 2-2X6 4-6 (1) 4-3 (1) 3-11 (1) 3-9 ... 1 2-0 1 1-9 1 2-2×6 3-5 2 3-0 2 2-8 2 2-2×8 4-4 2 3-9 2 3-5 2 2-2×10 5-3 2 4-7 3 4-2 3 2-2×12 6-1 2 5-4 ... SUPPORTING SIZE BUILDING WIDTH (FT) 20 24 28 32 SPAN (JACK STUDS) SPAN (JACK STUDS) SPAN (JACK STUDS) SPAN ...

  6. Waste Management

    Engineering / Public Works | Page

    23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ... 26 27 28 29 21 22 23 24 25 26 27 25 26 27 28 29 30 30 28 29* 30 31 S M T W TH F S S M T W TH ... 14 15 16 16 17 18 19 20 21 22 13 14 15 16 17 18 19 17 18 19 20 21 22 23 23 24 25 26 27 28 29 20 21 22 ...

  7. Permit Fee Calculator

    Community Development | Page

    $1.00- $500.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee $500.00 $23.50 $15.28 ... $0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ... review 25% plan review fee: $920.54 $7,085.39 $2,000,001.00- $3,000,000.00 Project Cost Permit Fee Plan ...

  8. Financial Reports

    Finance | Page

    Central School Statement 28 145 Airport Operations Statement 29 146 IRA Civic Center Statement 30 147 ... evidenced by UPM’s investment of over $10M in its manufacturing process equipment in 2019. With the City of ... together with a parts distribution center. In September of 2019, 100% of the ASV shares were purchased by ...

  9. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...

  10. Grand Rapids Pavement Art RFQ

    Arts & Culture Commission | Bid/RFP

    residents The Pavement Art Project In 2019, the Arts and Culture Commission installed The Memory of Water by ... the sculptures commissioned in 2019. This Request for Qualifications is for the Pavement Art. The Arts ... further details. Budget: $28,250 The budget for the pavement art project is $28,250. This do-not-exceed ...

Pages