Page not found

Search results

  1. 2023 Electric Security Light Rates

    Public Utilities | Page

    Adopted 12/18/2019 Effective 09/01/2020 Table 1 ... $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ... – Existing Pole 4200 Lumens 40 Watt LED LAMPS – Separate Pole 6600 Lumens 70 Watt LED LAMPS – Existing Pole ...

  2. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ... Nature RESIDENTIAL COMMERCIAL DEMAND AND ENERGY $ $ $ customer Charge (per month) 11.40 20.55 28.00 ... Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ...

  3. Maintenance Workers – Seasonal/Temporary

    Engineering / Public Works | Job Opening

    conditions.  Applicants should be available to work up to 40 hours per week, Monday – Friday, with some ... Closed- no longer accepting applications Wednesday, June 1, 2022- 4:30pm Display Contact Info Block Web ...

  4. Community Development Fee Schedule

    Community Development | Page

    ” high (non enclosed) Attached Steps/Deck (non enclosed) Covered porch (non enclosed) (2-9-15) $40.30 ... $96.50 Egress Windows (new) $40.30 $26.20 $1.00 $67.50 Residential Window Replacement (8-9-10) $60.00 ... $1.00 $61.00 Furnace Replacement (3-27-06) $40.30 $26.20 $1.00 $67.50 Water Heater/Softener $40.30 ...

  5. Public Utilities Financial Reports

    Public Utilities | Page

    in northcentral Minnesota, and is the county seat of Itasca County. On March 30, 1910, the Grand ... effluent per day; 4.0 million gallons from UPM/Blandin Paper Company and 1.5 million gallons from domestic ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ...

  6. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... a. Uniform Contract (under 40kW capacity)  b. ... Municipal Minnesota Interconnection Agreement (over 40kW or upon customer request)  c. Certificate of Completion      Detroit Lakes Public Utility’s 29.3 kW Select Solar  ...

  7. Solar Energy Rebate Program

    Public Utilities | Page

    Solar Electric Rebate Program: 09-15-2014 Image Slideshow Display Contact Info Block Web Page Menu ... Settings Solar Energy Rebate Program Sort A to Z grpuc_solar_electric_rebate_program_09-15-2014.pdf GRAND ... RAPIDS PUBLIC UTILITIES COMMISSION SOLAR ELECTRIC REBATE PROGRAM.5 kW – 40 kW The Grand Rapids Public ...

  8. 2022 Cost of Service Studies

    Public Utilities | Page

    projected to increase the cash balance from $1.5 million to $4.0 million (21.2% of operating revenues) at ... $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... Mapping 81,756 67,602 57,115 34,139 47,363------ Small tools 31,520 22,379 15,027 17,833 30,801 28,000 ...

  9. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... 0 116 117 232 233 870 over 870 30 $5.71 $3.99 $175.29 0 120 121 240 241 900 over 900 31 $5.71 $3.99 ...

  10. Data Request

    Police | Page

    over 30” high (non-enclosed) Attached Steps/Deck (non-enclosed) Covered porch (non-enclosed) $40.30 ... (new) $40.30 $26.20 $1.00 $67.50 Residential Window replacement $60.00 $1.00 $61.00 Furnace Replacement ... $40.30 $26.20 $1.00 $67.50 Water Heater/Softener $40.30 $26.20 $1.00 $67.50 Replace sink, toilet, faucet, ...

Pages