Page not found
Search results
-
Basic Wood Framing
Community Development | Page9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ... 2 3-3 2 2-11 2 2-2×8 4-9 2 4-2 2 3-9 2 2-2×10 5-9 2 5-1 2 4-7 3 2-2×12 6-8 2 5-10 3 5-3 3 3-2×8 5-11 ... 1 2-2×6 3-6 2 3-1 2 2-9 2 2-2×8 4-6 2 3-11 2 3-6 2 2-2×10 5-6 2 4-9 2 4-3 2 2-2×12 6-4 2 5-6 3 5-0 3 3-2×8 ...
-
Waste Management
Engineering / Public Works | Page5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 11 12 13 11 12 13 14 15 16 17 16 17 18 19 20 21 22 14 15 16 17 18 19 20 18 19 20 21 22 23 24 23 24 25 ... F S 1 2 3 4 1 2 1 2 3 4 5 6 7 5 6 7 8 9 10 11 3 4 5 6 7 8 9 8 9 10 11 12 13 14 12 13 14 15 16 17 18 10 11 12 13 14 15 16 15 16 17 18 19 20 21 ...
-
Public Utilities Financial Reports
Public Utilities | PageCollection Department – Detailed Schedule of Revenues and Expenses 48 – 49 Wastewater Treatment Facility ... economy. Recent annexations have increased the City’s population from 8,543 in 2005 to 11,283 in 2022. ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ...
-
2022 Cost of Service Studies
Public Utilities | Page19,505 20,090 Seminar/training 41,493 12,554 12,617 11,590 11,401 12,000 12,600 12,978 13,367 13,768 ... 2.0% 53.3% Lighting 1.1% 1.2%-7.8% Total 100.0% 100.0% 0.0% Cost-of-Service- 7- As indicated above, ... 2027 Operating Revenues $19,061,765 $18,448,198 $18,977,138 $19,515,558 $20,064,303 $20,624,106 Less ...
-
2023 City Multi-Family Water Rate Schedule
Public Utilities | Pageover 1,470 50 $5.71 $3.99 $289.49 0 200 201 400 401 1,500 over 1,500 51 $5.71 $3.99 $295.20 0 204 205 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... 150 over 150 6 $5.71 $3.99 $38.25 0 24 25 48 49 180 over 180 7 $5.71 $3.99 $43.96 0 28 29 56 57 210 ...
-
Distributed Energy Resources
Public Utilities | PageRapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Simplified Process (under 20kW capacity) c. Fast Track Process (see applicability within) d. Study Process (see applicability within) 2. ... Terminology .................................................................................................................. 2 1.1. Distributed ...
-
Financial Reports
Finance | Page2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... Transmittal 3 Certificate of Achievement 9 Principal City Officials and Department Heads 11 Organization Chart ... Notes to Financial Statements 49 Required Supplementary Information: Budgetary Comparison Schedule- ...
-
Grand Rapids Pavement Art RFQ
Arts & Culture Commission | Bid/RFPAmerican (3.1%), Latino (1.2%), Black (1.1%), and Asian (.9%) racial and ethnic minorities (U.S. Census ... Reservation; Native Americans are the largest racial/ethnic minority in Itasca County (4.9%). The City’s name ... residents The Pavement Art Project In 2019, the Arts and Culture Commission installed The Memory of Water by ...
-
MPCA MS4 Permit Public Notice Copy
Engineering / Public Works | Pagealternative formats https://www.pca.state.mn.us wq-strm4-49a • 9/ /20 Page 11 of 32 (Note: All or some of this ... formats https://www.pca.state.mn.us wq-strm4-49a • 9/ /20 Page 1 of 32 MS4 Part 2 Permit Application ... wq-strm4-49a • 9/ /20 Page 2 of 32 I certify under penalty of law that this document and all attachments were ...
-
2023 Wastewater Collection & Treatment Rate Schedule
Public Utilities | Page2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17.00 $20.00 $25.00 $35.00 $50.00 Commodity ... Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 5/8"-3/4" 1" 1 ¼" 1 ½" 2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17.00 ...