Page not found

Search results

  1. Waste Management

    Engineering / Public Works | Page

    23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ... 11 12 13 11 12 13 14 15 16 17 16 17 18 19 20 21 22 14 15 16 17 18 19 20 18 19 20 21 22 23 24 23 24 25 ... 26 27 28 29 21 22 23 24 25 26 27 25 26 27 28 29 30 30 28 29* 30 31 S M T W TH F S S M T W TH ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    economy. Recent annexations have increased the City’s population from 8,543 in 2005 to 11,283 in 2022. ... electric utility rates were based on the recommendations provided in the 2019 cost of service study. In ... in over a decade. In 2019, when GRPUC conducted the electric utility study, the AMI and AMR water ...

  3. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... property disposition (407,122) 4,474 11,650 (21,351) (29,861)------ Interest expense (27,648) (24,199) ... OPERATING EXPENSES Purchased Power 10,991,941$ 11,169,489$ 11,336,920$ 11,069,792$ 13,611,143$ 11 ...

  4. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... Transmittal 3 Certificate of Achievement 9 Principal City Officials and Department Heads 11 Organization Chart ... General Fund Statement 11 100 Schedule of Changes in Total OPEB Liability and Related Ratios Statement 12 ...

  5. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... Municipal Minnesota Interconnection Agreement (over 40kW or upon customer request)  c. Certificate of Completion      Detroit Lakes Public Utility’s 29 ...  Terminology .................................................................................................................. 2  1.1.  Distributed ...

  6. Permit Fee Calculator

    Community Development | Page

    $135,000.00 $1,201.80 $781.17 $67.50 $2,050.47 State did plan review 25% plan review fee: $195.29 $1,464.59 ... $37,132.00 State did plan review 25% plan review fee: $3,504.29 $26,619.14 Sheet2 Sheet3 ... $0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ...

  7. 2023 City Multi-Family Water Rate Schedule

    Public Utilities | Page

    150 over 150 6 $5.71 $3.99 $38.25 0 24 25 48 49 180 over 180 7 $5.71 $3.99 $43.96 0 28 29 56 57 210 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ...

  8. Itasca Clean Energy Solar Plus Battery Storage Project

    Public Utilities | Page

    facility includes a 2 Megawatt (MW) solar array paired with a 1 MW- 2.5 hour lithium ion battery surrounded ... STORAGE facility on June 29, 2023 from 2 to 6 p.m. This event will take place on the project site at 2515 ... with the community. The new facility includes a 2 Megawatt (MW) solar array paired with a 1 MW- 2.5 ...

  9. 2023 Adopted Levy and Tax Rate

    Finance | Page

    Page Categories 2023 Adopted Levy and Tax Rate Sort A to Z 2023_levy_and_tax_rate.pdf 2018 Levy 2019 ... Levy 2020 Levy 2021 Levy 2022 Levy Payable 2019 Payable 2020 Payable 2021 Payable 2022 Payable 2023 ... 80,000 Levy Internal Loan-Equip Purchases 219,000 179,000 192,000 224,000 224,000 Abatement Levies 25 ...

  10. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17.00 $20.00 $25.00 $35.00 $50.00 Commodity ... Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 5/8"-3/4" 1" 1 ¼" 1 ½" 2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17.00 ...

Pages