Page not found
Search results
-
2023 Electric Security Light Rates
Public Utilities | Page– Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ... 01/01/2023 Last Revised: Adopted 12/15/2021 Adopted 02/17/2021 Effective 04/01/2022 Effective 02 ... /17/2021 Adopted 12/18/2019 Effective 09/01/2020 Table 1 ...
-
Public Utilities Financial Reports
Public Utilities | Page2022 Annual Comprehensive Financial Report 2021 Annual Comprehensive Financial Report 2020 Annual ... to 22.9 kV for distribution to 6 major substations, 5 rural step-down stations, or directly ... transformed to consumer applicable voltages. The main 115 kV to 22.9 kV substation was constructed in 2005 at ...
-
Kill A Watt Meter
Grand Rapids Area Library | Pagea 2-week loan from the library at 140 NE 2nd Street, Grand Rapids. To reserve a Kill A Watt meter, call the ... cumulative kilowatt-hours of energy usage, and displays volts, amps, and watts at a 0.2% accuracy rating. ...
-
Waste Management
Engineering / Public Works | Page5 6 7 8 9 10 11 8 9 10 11 12 13 14 12 13 14 15 16 17 18 12 13 14 15 16 17 18 15 16 17 18 19 20 21 19 20 21 22 ... 23 24 25 19 20 21 22 23 24 25 22 23 24 25 26 27 28 26 27 28 26 27 28 29 30 31 29 30 31 S M T W TH ... 11 12 13 11 12 13 14 15 16 17 16 17 18 19 20 21 22 14 15 16 17 18 19 20 18 19 20 21 22 23 24 23 24 25 ...
-
2023 City Water Rates
Public Utilities | PageGallons Next 22,000 Gallons All Gallons Over 30,000 City Commercial First 40,000 Gallons Next 360,000 ... $11.01 $3.94 $4.87 $6.22 $3.76 $4.64 Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: ... Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ...
-
Permit Fee Calculator
Community Development | Page$0.25 $39.02 $501.00- $2,000.00 Project Cost Permit Fee Plan Review Fee State Surcharge Total Fee ... $800.00 $34.25 $22.26 $0.40 $56.91 $2,001.00- $25,000.00 Project Cost Permit Fee Plan Review Fee State ... $31,835.00 State did plan review 25% plan review fee: $2,987.54 $22,872.39 $5,000,001.00 AND OVER Project ...
-
Financial Reports
Finance | Page2020 Assets: Current and other assets $22,028,726 $23,219,060 $752,040 $394,602 $22,780,766 $23,613,662 ... and Changes in Fund Balance- Nonmajor Special Revenue Funds Statement 22 124 Subcombining Balance ... sites in this redevelopment began in the fall of 2020. A permit application has been submitted for ...
-
City Council Regular Meeting
City Council | Page | 06/22/20 04:00pmMeeting with Agenda and Minutes Monday, June 22, 2020- 4:00pm Agenda Image Slideshow Display ...
-
2021-2025 Amended Capital Improvement Plan
Finance | Page9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... Blandin Beach House Demo 20 Blandin Beach Restrooms 21 Blandin Beach Pavilion 22 New Fire Hall/Police Evidence 23 Building ... improvements described in the capital improvement plan. 1.02. Before the approval of the capital improvement ...
-
2022 Cost of Service Studies
Public Utilities | Pagecontract with MP which became effective 1/1/22 has a significant impact on the overall results. An overall ... center. The combined capital improvements for the electric utility are shown in Table 2-2 below. Projected ... Operating Results – Existing Rates- 5- Table 2-2 Capital Improvements Capital Item 2022 2023 2024 2025 2026 ...