Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ... OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 FINANCIAL SECTION (cont.) ...

  2. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... longer be produced or imported as of 2019. In addition, the 52-year old piping in the floor contains slow ... COMPREHENSIVE FINANCIAL REPORT OF THE CITY OF GRAND RAPIDS, MINNESOTA For The Year Ended December 31, 2021 ...

  3. 2022 Cost of Service Studies

    Public Utilities | Page

    0.6%-0.2%-2.1%-1.3%-3.9% 15.0% 5.0% 2.1%-0.9%-2.9%-3.6% CASH RESERVES Beginning of Year 1,520,146$ 4,118,902$ 4,521,158$ ... examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... first year of the new contract, GRPUC set the PPAC adjustment at $0.01583/kWh. For future years in the ...

  4. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ... 05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ...

  5. Data Request

    Police | Page

    each Zoning Map $15.15*each Zoning Ordinance $30.30* each Subdivision Ordinance $5.05* each Zoning ... Soccer) pay $5.00 per player per year to use our fields. Adults pay $15.00 per player. POLICE DEPARTMENT ... $0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ...

  6. 2023 Electric Vehicle Service Rate Schedule

    Public Utilities | Page

    12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ... After: Customer Energy Charge Charge (per month) 4.15 26.25 existing or standalone charqe existing or All ... Effective 05/01/2021 I\...l--"--...l-i ""l /-i O /"'11"\-i I"\ ...

  7. 2023 City Electric Interim Annexation Areas Service Rate Schedule

    Public Utilities | Page

    12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 ... Effective 05/01/2021 ...

  8. Electric Distribution

    Public Utilities | Page

    September 1, 2015. In addition, beginning in 2019, the generation capacity charge for each year is based on ... prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... previous year’s average annual billed demand, excluding any existing renewable generation capacity prior to ...

  9. Stormwater Credits Policy

    Engineering / Public Works | Page

    utilized more than 15 days per year are excluded from the green space credit, as these are impacted, ... Ordinance No. 17-05-03) Background On May 8, 2017, the Grand Rapids City Council approved a Stormwater ... Utility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ...

  10. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    106 CP 2019‐2, GR/Cohasset Connection Trail Phase 2 107 Year Project Starts: 2024 ... 1 City Council Resolution Adopting the 2021 ‐ 2025 2‐3 City of Grand Rapids Amended Capital Improvement Plan Five Year ...  Plan Summary of Project Costs 4‐6 Five Year Plan Summary of Funding Sources by Category 7‐8 Five Year ...