Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ... Expenses 44 – 45 Water Department – Detailed Schedule of Revenues and Expenses 46 – 47 Wastewater ...

  2. Community Development Fee Schedule

    Community Development | Page

    each additional $1,000.00 or fraction thereof, to and including $25,000.00 (3-27-06) $25,001.00 to ... (3-27-06) $15.15* each Comprehensive Plan Appendix (3-27-06) $25.25* each Zoning Letter $35.35* each Zoning ... thereof, to and including $2,000.00 $2,001.00- $25,000.00 $70.00 * for the first $2,000.00 plus $14.20* for ...

  3. 2022 Cost of Service Studies

    Public Utilities | Page

    $3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... first year of the new contract, GRPUC set the PPAC adjustment at $0.01583/kWh. For future years in the ...

  4. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... longer be produced or imported as of 2019. In addition, the 52-year old piping in the floor contains slow ... COMPREHENSIVE FINANCIAL REPORT OF THE CITY OF GRAND RAPIDS, MINNESOTA For The Year Ended December 31, 2021 ...

  5. Data Request

    Police | Page

    $100.00 Temporary on-sale $25.00 Rollerskating License $200.00 per year or fraction thereof Brewer ... Merchant (Resolution No. 06-110) $150.00 per year Permit to keep Chickens $20.00 per year CENTRAL SCHOOL ... animal violations $25.00 Registration of a Dangerous Dog (Res. 06-61) $500.00 Fireworks: Illegal Use, ...

  6. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    citycouncil_agenda_2012-06-25.pdf Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings City Council ... Regular Meeting Sort A to Z citycouncil_worksession_2012-06-25_3.pdf CITY OF GRAND RAPIDS Meeting Agenda ... 1 Printed on 6/25/2012 powered by Legistar'^"citycouncil_agenda_2012-06-25.pdf CITY OF GRAND ...

  7. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    Maintenance Five Year Plan Summary 24‐25 City Hall RTU #3 26 City Hall RTU #1 27 ... 106 CP 2019‐2, GR/Cohasset Connection Trail Phase 2 107 Year Project Starts: 2024 ... Priority 3 Important Justification The existing boards and fencing were installed approximately 25 years ...

  8. GROW Grand Rapids 2040 Comprehensive Plan

    Community Development | Page

    progress and changing the plan in future years as needed WINONA COUNTY’S “UPDATE 2000” Winona County ... a 10-year period found that where contamination standards for drinking water were exceeded, water suppliers ... 20 years just to keep pace with the demand for drinking water. A 1998 assessment by the Pollution ...

  9. Itasca Clean Energy Solar Plus Battery Storage Project

    Public Utilities | Page

    power in April 2022. • Anticipated 25-year lifespan. Battery Energy Storage System • 1 MW-2.5 hour ... facility includes a 2 Megawatt (MW) solar array paired with a 1 MW- 2.5 hour lithium ion battery surrounded ... with the community. The new facility includes a 2 Megawatt (MW) solar array paired with a 1 MW- 2.5 ...

  10. 2023 Adopted Levy and Tax Rate

    Finance | Page

    Page Categories 2023 Adopted Levy and Tax Rate Sort A to Z 2023_levy_and_tax_rate.pdf 2018 Levy 2019 ... Levy 2020 Levy 2021 Levy 2022 Levy Payable 2019 Payable 2020 Payable 2021 Payable 2022 Payable 2023 ... 80,000 Levy Internal Loan-Equip Purchases 219,000 179,000 192,000 224,000 224,000 Abatement Levies 25 ...

Pages