Page not found

Search results

  1. 2022 Cost of Service Studies

    Public Utilities | Page

    examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... first year of the new contract, GRPUC set the PPAC adjustment at $0.01583/kWh. For future years in the ... Rates- 3- formula. Table 2-1 lists the PPAC rates for each year as included in the projections. The new ...

  2. Public Utilities Financial Reports

    Public Utilities | Page

    Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ... OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 FINANCIAL SECTION (cont.) ...

  3. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 03/28/19 04:00pm

    Meeting with Agenda and Minutes Thursday, March 28, 2019- 4:00pm Agenda Image Slideshow Display ... Pokegama Avenue, in Grand Rapids, Minnesota on Thursday, March 28, 2019 at 4:00pm. AGENDA 1. Call to Order ... Approval ofminutes from the February 28, 2019 regular meeting. 5. Consider approval of claims 6. IEDC ...

  4. City Council Regular Meeting

    City Council | Calendar Event | 06/25/12 04:00pm

    rent at the rate of $0.28 per square foot per year, which equates to a total rent as described on the ... citycouncil_agenda_2012-06-25.pdf Image Slideshow Display Contact Info Block Web Page Calendar Event Menu Settings City Council ... Regular Meeting Sort A to Z citycouncil_worksession_2012-06-25_3.pdf CITY OF GRAND RAPIDS Meeting Agenda ...

  5. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

    106 CP 2019‐2, GR/Cohasset Connection Trail Phase 2 107 Year Project Starts: 2024 ... 1 City Council Resolution Adopting the 2021 ‐ 2025 2‐3 City of Grand Rapids Amended Capital Improvement Plan Five Year ...  Plan Summary of Project Costs 4‐6 Five Year Plan Summary of Funding Sources by Category 7‐8 Five Year ...

  6. 2023 Electric Security Light Rates

    Public Utilities | Page

    Effective/Billed after 01/01/2023 RATES: High Pressure Sodium Vapor Lamps: $9.23 $5.70 $10.06 8,500 Lumens 100 Watt ... $13.21 23,000 Lumens 250 Watt – Separate Pole $15.93 $4.88 LED Lamps: 4200 Lumens 40 Watt LED LAMPS ... – Existing Pole 4200 Lumens 40 Watt LED LAMPS – Separate Pole 6600 Lumens 70 Watt LED LAMPS – Existing Pole ...

  7. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... longer be produced or imported as of 2019. In addition, the 52-year old piping in the floor contains slow ... COMPREHENSIVE FINANCIAL REPORT OF THE CITY OF GRAND RAPIDS, MINNESOTA For The Year Ended December 31, 2021 ...

  8. Community Development Fee Schedule

    Community Development | Page

    Door (12-17-12) $40.00 $1.00 $41.00 Siding Replacement (3-27-06) $60.00 $1.00 $61.00 All Regulated ... $1.00 $61.00 Furnace Replacement (3-27-06) $40.30 $26.20 $1.00 $67.50 Water Heater/Softener $40 ... Commercial Demolitions (3-27-06) $40.00* $1.00 $41.00 Fireplaces & free standing stoves (Gas or Wood) ...

  9. Structural Engineers Reports

    Administration | Page

    approximately 40 feet by adding two new trusses and roof purlins. A large addition including an additional East ... (9/28/2007). No structural analysis was completed for this study. c) Structural Engineering Memorandum ... 6 years until 2003 when the 2000 international building code (IBC) was adopted in Minnesota. Under the ...

  10. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ... a. Uniform Contract (under 40kW capacity)  b. ... Municipal Minnesota Interconnection Agreement (over 40kW or upon customer request)  c. Certificate of Completion      Detroit Lakes Public Utility’s 29.3 kW Select Solar  ...

Pages