Page not found
Search results
-
Public Utilities Financial Reports
Public Utilities | PageFinancial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ... Expenses 44 – 45 Water Department – Detailed Schedule of Revenues and Expenses 46 – 47 Wastewater ...
-
2022 Cost of Service Studies
Public Utilities | Page$3,358,155 As a percent of revenue 21.6% 24.5% 25.1% 23.0% 19.9% 16.3% Exhibit 2-A 2017 2018 2019 2020 2021 ... examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... first year of the new contract, GRPUC set the PPAC adjustment at $0.01583/kWh. For future years in the ...
-
Financial Reports
Finance | Page2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... longer be produced or imported as of 2019. In addition, the 52-year old piping in the floor contains slow ... COMPREHENSIVE FINANCIAL REPORT OF THE CITY OF GRAND RAPIDS, MINNESOTA For The Year Ended December 31, 2021 ...
-
Data Request
Police | Page$0.10/page CD/DVD $5.00/disc Flash Drive (4-8GB) $10.00 Flash Drive (16-32GB) $15.00 Notary Service $1.00 ... purposes: This authorization is dated and expires on The expiration cannot exceed one year from the date of ... insurance or non-cancelable or guaranteed renewable health insurance and identified as such, two years after ...
-
City Council Regular Meeting
City Council | Calendar Event | 06/25/12 04:00pmMeetinq 5:09 CONSENT AGENDA p.m. Any item on the consent agenda shall be removed for consideration by ... Mayor and City Administrator to sign the School Liaison Officer Agreement for the 2012-2013 school year ... DEPARTMENT p.m. 16. 12-0404 Authorization to begin the process of filling the Building Official vacancy. 5:30 ...
-
City Council Regular Meeting
City Council | Calendar Event | 05/14/12 04:00pm6,444,608 40,167,796 Wednesdav, May 09, 10/1 C/TY OF GRAND RAP/DS LEW COMPAR/SONS FOR YEARS 2011- 2016 Based ... increase 17.45% 2.47% 16.37% 32.72% 11.88% Miles of street improvements 0.36 1.20 4.89 6.13 0.63 5/9/2012 ... for the 2012 plan year and authorize payment of the insurance premium including the agent fee. 16 ...
-
City Council Regular Meeting
City Council | Calendar Event | 07/13/15 04:00pmVERIFIED CLAIMS PM 16. 15-1462 Consider approving the verified claims for the period June 16, 2015 to July ... Rapids- Itasca County Airport for Federal Fiscal Year 2015. Approved by consent roll call CITY OF GRAND ... Bill Zeige Councilor Rick Blake 6: 00 ENGINEERING PM 16. Consider approving a professional services ...
-
2023 City Multi-Family Water Rate Schedule
Public Utilities | PageZ 2023_city_multi-family_water_rate_schedule_adopted_12.14.22.pdf from to from to from to 2 $5.71 $3.99 $15.41 0 8 9 16 17 60 over 60 3 $5.71 $3.99 $21.12 0 12 13 ... 24 25 90 over 90 4 $5.71 $3.99 $26.83 0 16 17 32 33 120 over 120 5 $5.71 $3.99 $32.54 0 20 21 40 41 ... 270 10 $5.71 $3.99 $61.09 0 40 41 80 81 300 over 300 11 $5.71 $3.99 $66.80 0 44 45 88 89 330 over 330 ...
-
GROW Grand Rapids 2040 Comprehensive Plan
Community Development | Pageprogress and changing the plan in future years as needed WINONA COUNTY’S “UPDATE 2000” Winona County ... a 10-year period found that where contamination standards for drinking water were exceeded, water suppliers ... governments. 1997 Community-based planning (Laws of Minnesota 1997, sections 4A.08 –.09). Enumerated broad ...
-
Basic Wood Framing
Community Development | Pagematerial on edge 2X Bottom plate 2X studs 16” or 24” O.C. 2X Double top plate 2 TABLE R602.3(5) SIZE, ... Laterally unsupported stud heighta (feet) Maximum spacing (inches) 2 × 3b — — — — — 10 16 2 × 4 10 24c 16 ... c — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ...