Page not found

Search results

  1. Public Utilities Financial Reports

    Public Utilities | Page

    Financial Report As of and for the Fiscal Years Ended December 31, 2022 and 2021 Prepared by: Business ... Minnesota TABLE OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 INTRODUCTORY SECTION ... OF CONTENTS As of and for the Years Ended December 31, 2022 and 2021 FINANCIAL SECTION (cont.) ...

  2. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ... 2" 3" 4" 6" Rate $11.50 $13.00 $15.00 $17.00 $20.00 $25.00 $35.00 $50.00 Commodity ...

  3. 2022 Cost of Service Studies

    Public Utilities | Page

    examination of the allocated cost of service based on a 2021 ‘Test Year.’ It also includes projected operating ... first year of the new contract, GRPUC set the PPAC adjustment at $0.01583/kWh. For future years in the ... Rates- 3- formula. Table 2-1 lists the PPAC rates for each year as included in the projections. The new ...

  4. Financial Reports

    Finance | Page

    2019 and 2020, 2021 building permit activity was nearer to the 20-year annual average of $25.5M, with ... longer be produced or imported as of 2019. In addition, the 52-year old piping in the floor contains slow ... COMPREHENSIVE FINANCIAL REPORT OF THE CITY OF GRAND RAPIDS, MINNESOTA For The Year Ended December 31, 2021 ...

  5. Data Request

    Police | Page

    BUILDING Monthly Rental Fees Garden Level $11.02 * 1st Floor $11.97 * 2nd Floor $11.49 * 3rd Floor $ 8.58 ... Data not on Individuals Meaning of Classification Public MS §13.02, subd. 15 Public MS §13.02, subd. 15 ... Public MS §13.02, subd. 4 Available to anyone for any reason Private MS §13.02, subd. 12 Private MS ...

  6. 2023 Electric Security Light Rates

    Public Utilities | Page

    – Existing Pole $ 9.22 8,500 Lumens 100 Watt – Separate Pole $11.94 23,000 Lumens 250 Watt – Existing Pole ... 01/01/2023 Last Revised: Adopted 12/15/2021 Adopted 02/17/2021 Effective 04/01/2022 Effective 02 ... /17/2021 Adopted 12/18/2019 Effective 09/01/2020 Table 1 ...

  7. 2023 City Water Rates

    Public Utilities | Page

    Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 $4.36 $6.89 ... $11.01 $3.94 $4.87 $6.22 $3.76 $4.64 Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: ...

  8. 2023 Adopted Levy and Tax Rate

    Finance | Page

    $11,129,938 Net amount levied to property owners $7,975,967 TAX TAXABLE NET CITY CEMETERY TOTAL YEAR TAX ... Page Categories 2023 Adopted Levy and Tax Rate Sort A to Z 2023_levy_and_tax_rate.pdf 2018 Levy 2019 ... Levy 2020 Levy 2021 Levy 2022 Levy Payable 2019 Payable 2020 Payable 2021 Payable 2022 Payable 2023 ...

  9. Distributed Energy Resources

    Public Utilities | Page

    Rapids Public Utilities Distributed Energy Resources Interconnection Procedure 5/8/2019 ...  Terminology .................................................................................................................. 2  1.1.  Distributed ...  of the Distributed Energy Resources ................................................................. 11  6.1.  Existing ...

  10. 2021-2025 Amended Capital Improvement Plan

    Finance | Page

     Funding Source Summary 9 Levy Comparisons ‐ 2020 ‐ 2025 10 Grand Rapids/Itasca County Airport Five Year Plan Summary 11 RWY 16/34 Reconstruction 12 ... CP 2021‐2, 5th St SW (10th Ave ‐ 11th Ave) 100 CP 2021‐3, Industrial Park Utility Extention 101 Year Project Starts: 2022 ... 106 CP 2019‐2, GR/Cohasset Connection Trail Phase 2 107 Year Project Starts: 2024 ...

Pages