Page not found
Search results
-
City Council Regular Meeting
City Council | Page | 11/10/14 04:00pmMeeting with Agenda and Minutes Monday, November 10, 2014- 4:00pm Agenda Agenda Work Session ...
-
City Council Regular Meeting
City Council | Page | 03/10/14 04:00pmMeeting with Agenda and Minutes Monday, March 10, 2014- 4:00pm Agenda Agenda Work Session Agenda ...
-
Permit Fee Calculator
Community Development | PageReview Fee State Surcharge Total Fee $630,000.00 $3,890.10 $2,528.57 $315.00 $6,733.66 State did plan ... review 25% plan review fee: $632.14 $4,837.24 $1,000,001.00- $2,000,000.00 Project Cost Permit Fee Plan ... Cost Permit Fee Plan Review Fee State Surcharge Total Fee $6,000,000.00 $21,564.85 $14,017.15 $1,550.00 ...
-
How Do I Obtain A Building Permit
Community Development | Pageincluded where applicable): Attached 12X12 Deck $132.50 flat rate Basement remodeling ($10,000 valuation) ... $307.94 Reroof house ($7500 valuation) $61.00 flat rate Garage ($10,000 valuation) $307.94 Dwelling ... take to get a permit? Permits for work that requires no review are issued the same day and generally at ...
-
Police Reserves
Police | Pageyear, providing security at the yearly Tall Timber Days, Car show and Swap, Itasca County Fair, National ... also provide traffic control for the Timber Man Triathlon and several 5K and 10K runs a year. They ...
-
Stormwater Credits Policy
Engineering / Public Works | PageUtility Ordinance No. 17- 05-03 (Ordinance Chapter 24, section 1.0 through 1.6) to finance the City’s ... 90 days of approval. No retroactive credits will be approved or applied to billings. Per section ... stormwater utility charges. Only those properties that can demonstrate the capacity to handle a 10-year or ...
-
Radon
Community Development | Pagesieve and be retained by a 1/4-inch sieve or b) A layer of sand overlain by a layer or strips of ... least 12 inches above the roof at least 10 feet from any window or other opening into conditioned spaces ... that is less than 2 feet below the exhaust point and at least 10 feet from any window or opening into ...
-
Utility Information
Engineering / Public Works | Pagesection 1.0 through 1.6) to finance the City’s Stormwater Management Program. In addition, the Utility ... year. If the credit is approved, the credit will be applied within 90 days of approval. No retroactive ... can demonstrate the capacity to handle a 10-year or 100-year rain event can receive a stormwater ...
-
Asphalt Art Guide
Arts & Culture Commission | PageDragonfly mural in 2014, 2015, 2016, and 2019. Photo by Lisa Cach Green Lake Dragonfly 14 ... founded by Michael R. bloomberg in 2014. We work side by side with client cities to improve the quality of ... Italy (Case study on page 45) Photo by bloomberg Philanthropies C a S E S T U D IE S CASE STUDIES 10 ...
-
Garages: One Story
Community Development | Page12” o.c. Hem Fir 6’1” 9’6” 12’2” 14’10” SPF 6’6” 10’2” 13’2” 15’9” 16” o.c. Hem Fir 5’6” 8’4” 10 ... Span Header Size # Jack Studs Span Heade r Size # Jack Studs 2-10 2-2X4 1 2-6 2-2X4 1 2-3 2-2X6 1 4-2 ... 2-2X6 1 3-8 2-2X6 1 3-3 2-2X6 1 5-4 2-2X8 2 5-7 2-2X10 2 5-0 2-2X10 2 6-6 2-2X10 2 6-6 2-2X12 2 5-10 ...