Page not found

Search results

  1. Economic Development Authority

    Economic Development Authority | Page

    Thursday of each month 7 72 months Sort A to Z ...

  2. Internet Policies

    Grand Rapids Area Library | Page

    20   General Statement:   In keeping with its mission of facilitating equal access to information ... including the Internet. 20.1  Special Statement on On-line Resources:  The electronic resources available ... through the library's Internet computers are not selected or even monitored by staff. 20.2  The ...

  3. 2023 Water Irrigation Rates

    Public Utilities | Page

    calculated are per month Meter Size 5/8"-3/4" 1" 1 ¼" 1 ½" 2" 3" 4" ... calculated are per 1000 gallons per month Irrigation- Residential & Commercial All gallons $6.22 ...

  4. Footings, Foundations & Slabs

    Community Development | Page

    shall be attached to the sill with a 20 gage metal angle clip at 24 inches on center, with five 8d nails ... Requirement A 8 – 8d per joist per Table R602.3(1) B 1 – 20 gage angle clip each joist with 5 – 8d per leg ... shall be 2X6 minimum. Anchor bolt shall be minimum 0.5” diameter cast in place with 7” embed. Anchor ...

  5. 2023 Ancillary Services and Fees

    Public Utilities | Page

    reconnect – meter reinstalled $60.00 Seasonal disconnects – meter remains No Charge Monthly service charges ... reconnect per year) No Charge Monthly service charge continues Emergencies No Charge Plumbing Repairs with ... construction (Garden hose hookup 1” meter only – six months) Water line thawing and frozen meter Curb stop to ...

  6. School District Population Estimates

    Administration | Page

    tenant of the IRA Civic Center, ISD 318 hosts over 36 events per year. With 60.2% of our students living ...

  7. Radon

    Community Development | Page

    24 inches in diameter and 36 inches high must be provided. 16) Identification. Each vent pipe must be ... LOCATION REQUIRED SUMPS PASSIVE SYSTEM (Minimum Required) ACTIVE SYSTEM 24” 36” 1. Gasketed and sealed ... cover 2. Interior drain tile loop 3. Radon vent to sump 1. Electrical circuit in approved box 2. 24”X36 ...

  8. Site Plans

    Community Development | Page

    Draw the site plan to the most appropriate scale, for example, 1" = 10’, 1" = 20’, 1/4" ... 30 Ft Lot Lines 60 Ft Street Right of Way Scale 1” = 10’ Existing Dwelling 38 Ft Wide X 20 Ft Deep ... Dwelling 38 Ft Wide X 20 Ft Deep Driveway ...

  9. Commercial Utility Service Application

    Public Utilities | Page

    a deposit equal to twice the average monthly GRPUC service billing (or estimate, if not known). The deposit ... letter of credit is provided for a 12-month time period. METER READING & BILLING: GRPUC bills utility ... services based on meter readings at GRPUC approved rates. Account bills are mailed monthly. Paperless ...

  10. Grand Rapids / Itasca County Airport

    Engineering / Public Works | Page

    20-year planning period One takeoff and one landing is considered two operations The family of aircraft ... property tax Approximately 20,011 operations per year increasing to 24,537 over the 20-year planning period ...

Pages