Page not found

Search results

  1. ADA (Americans with Disabilities Act) Transition Plan

    Engineering / Public Works | Page

    .................................................................................................................... 10 Previous Practices ... ..................................................................................................................... 10 Policy ... ......................................................................................................................................... 10 ADA Coordinator ...

  2. Site Plans

    Community Development | Page

    Draw the site plan to the most appropriate scale, for example, 1" = 10’, 1" = 20’, 1/4" ... 30 Ft Lot Lines 60 Ft Street Right of Way Scale 1” = 10’ Existing Dwelling 38 Ft Wide X 20 Ft Deep ... Exst. 12X12 Shed Proposed New 12X24 Ft Garage Driveway Scale 1” = 10’ Proposed New Garage Existing ...

  3. 2023 Rural Electric Service Rate Schedule

    Public Utilities | Page

    Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted 12/18/2019 Effective ... 05/01/2021 Adopted 12/18/2019 Effective 09/01/2020 ...

  4. 2023 Wastewater Collection & Treatment Rate Schedule

    Public Utilities | Page

    All Gallons $4.99 Revised: Adopted 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 ... 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 02/01/2022 Adopted 12/19/2018 Effective 01/01/2019 ...

  5. Radon

    Community Development | Page

    least 12 inches above the roof at least 10 feet from any window or other opening into conditioned spaces ... that is less than 2 feet below the exhaust point and at least 10 feet from any window or opening into ... an adjoining or adjacent building. 10) Active systems. If an active system is installed, the vent ...

  6. Building Plans

    Community Development | Page

    etc.- 4- EXISTING DWELLING 16’ 6” 13’ PIN NEW FOOTING TO EXISTING CENTER PAD 24” X 24” 10” DEEP 8” x 20” ... Double Top Plate Manufactured Wood Trusses 24” o.c. 10 Inch by ½ Inch Anchor Bolts 6 Ft o.c., 12 inches ... ¾ Inch T&G Plywood over 2X10 Floor Joists, #2 Hem-Fir – 16” o.c. 2X6 Bottom Plate 2X6 Studs, 16” o.c. ...

  7. 2023 Load Management Electric Service Rate Schedule

    Public Utilities | Page

    Adopted 12/14/2022 Effective 01/01/2023 Last Revised: Adopted 12/15/2021 Effective 04/01/2022 Adopted ... 12/18/2019 Effective 05/01/2021 June-September @ customer's normal electric customer charge ...

  8. Veteran's Park

    Facilities | Page

    Veteran's Park is located at 10 NE 8th Ave, Grand Rapids, MN. The park has many amenities ... not more than $1,000.00. Image Slideshow Veteran's Park 10 NE 8th Avenue Grand Rapids, MN 55744 ...

  9. Electric Distribution

    Public Utilities | Page

    prior to that date, a new customer of GRPU with a 15-minute peak of equal to or greater than 10 MW ... renewable generation capacity up to ten percent (10%) (non-cumulative) of the total GRPUC load, based on the ...

  10. Donate Books

    Grand Rapids Area Library | Page

    (technology, tax, investment, medical, legal) generally more than 10 years old Books that have been kept in ... than 10 years old) Image Slideshow Display Contact Info Block Web Page Menu Settings Donate Books Sort ...

Pages