Page not found

Search results

  1. Stormwater Credits Policy

    Engineering / Public Works | Page

    90 days of approval. No retroactive credits will be approved or applied to billings. Per section ... be 20 feet or more away from the nearest impervious surface or structure. 4. The green space must be ... utilized more than 15 days per year are excluded from the green space credit, as these are impacted, ...

  2. Temporary 3.2 Beer Sales and Service

    Administration | Page

    basics: License may be issued for a total of thirty-five (35) days in a calendar year, which days need not ... days prior to your scheduled event. Pay $25 license fee. Payment may be made by phone by calling: ...  No temporary license shall exceed 35 days in duration, which days need not be  consecutive.   No more than three temporary licenses may be granted to one organization in a  ...

  3. Economic Development Authority Regular Meeting

    Economic Development Authority | Calendar Event | 02/08/18 04:00pm

    Meeting with Agenda and Minutes Thursday, February 8, 2018- 4:00pm greda_20180208.pdf Image ... February 8, 2018 4: 00pm Grand Rapids City Hall NOTICE IS HEREBY GIVEN, that a regular meeting of the Grand ... 420 North Pokegama Avenue, in Grand Rapids, Minnesota on Thursday, February 8, 2018 at 4:00pm. AGENDA ...

  4. Disaster Preparedness

    Fire | Page

    everyone immediately. Help may not arrive for hours or days. You and your family need to be prepared ahead ... Preparedness. Sparky® is a registered trademark of the NFPA. q Water – one gallon per person per day for ... drinking and sanitation — store 3-day supply q Ready-to-eat food, canned juices, comfort/stress foods — at ...

  5. Utility Information

    Engineering / Public Works | Page

    year. If the credit is approved, the credit will be applied within 90 days of approval. No retroactive ... 2. The space shall not have more than 25% impacted, compacted soils. 3. Green space must be 20 feet ... utilized more than 15 days per year are excluded from the green space credit, as these are impacted, ...

  6. Fee Refunds

    Community Development | Page

    days of the date the fee was paid or the request will not be considered. 100% of permit fees may be ... upon written application filed by the original applicant no later than 180 days after the date of the ...

  7. Decks

    Community Development | Page

    building plans. Building permits are typically processed within 5 business days of receiving a complete set ... JOIST 12” O.C. FOOTINGS Call Gopher State One Call for utility locations at least two working days ... Area of Deck Supported in Sq Ft Footing Diameter Required in Inches 14 8 43 14 87 20 18 9 49 15 96 21 ...

  8. Chicken Permit

    Administration | Page

    submitted to City Hall  20-09-05 Ordinance amending and updating Article VIII (Chickens) within Chapter 10 ... Animals:  Allowing Chickens to be raised in the City limits Permit fee: $20  This permit applies to chickens only. ... FOR KEEPING CHICKENS INSIDE CITY LIMITS LICENSE: Keeping of Chickens TOTAL FEE: $20.00 LICENSEE ...

  9. Basic Wood Framing

    Community Development | Page

    — 24 14 24 3 × 4 10 24 24 16 24 14 24 2 × 5 10 24 24 — 24 16 24 2 × 6 10 24 24 16 24 20 24 For SI: ... SUPPORTING SIZE BUILDING WIDTH (FT) 20 24 28 32 SPAN (JACK STUDS) SPAN (JACK STUDS) SPAN (JACK STUDS) SPAN ... 9-0 (1) 8-4 (2) 4-2X12 11-9 (1) 10-11 (2) 10-2 (2) 9-8 (2) Two floors 2-2X4 2-2 (1) 2-0 (1) 1-10 (1) ...

  10. Site Plans

    Community Development | Page

    Draw the site plan to the most appropriate scale, for example, 1" = 10’, 1" = 20’, 1/4" ... 30 Ft Lot Lines 60 Ft Street Right of Way Scale 1” = 10’ Existing Dwelling 38 Ft Wide X 20 Ft Deep ... Dwelling 38 Ft Wide X 20 Ft Deep Driveway ...

Pages