Page not found

Search results

  1. Grand Rapids Area Library Contact Information

    Grand Rapids Area Library | Custom Contact Page

    M-Th 10:00 – 6:00; F 10:00-2:00 https://www.facebook.com/grandrapidsarealibrary/ ...

  2. Complete Application Packet: Off-sale

    Administration | Page

    Check Box37: Check Box38: 1: 2: 3: 4: 5: 6: 7: 8: 9: 10: 11: 12: 13: 14: 15: 16: 17: 18: 19: 20: 21: 22 ... Box18: Check Box19: Check Box20: Check Box21: Check Box22: Check Box23: Check Box24: Check Box25: Group3: ...

  3. Site Plans

    Community Development | Page

    Draw the site plan to the most appropriate scale, for example, 1" = 10’, 1" = 20’, 1/4" ... 30 Ft Lot Lines 60 Ft Street Right of Way Scale 1” = 10’ Existing Dwelling 38 Ft Wide X 20 Ft Deep ... Exst. 12X12 Shed Proposed New 12X24 Ft Garage Driveway Scale 1” = 10’ Proposed New Garage Existing ...

  4. Radon

    Community Development | Page

    least 12 inches above the roof at least 10 feet from any window or other opening into conditioned spaces ... that is less than 2 feet below the exhaust point and at least 10 feet from any window or opening into ... an adjoining or adjacent building. 10) Active systems. If an active system is installed, the vent ...

  5. Building Plans

    Community Development | Page

    etc.- 4- EXISTING DWELLING 16’ 6” 13’ PIN NEW FOOTING TO EXISTING CENTER PAD 24” X 24” 10” DEEP 8” x 20” ... Double Top Plate Manufactured Wood Trusses 24” o.c. 10 Inch by ½ Inch Anchor Bolts 6 Ft o.c., 12 inches ... ¾ Inch T&G Plywood over 2X10 Floor Joists, #2 Hem-Fir – 16” o.c. 2X6 Bottom Plate 2X6 Studs, 16” o.c. ...

  6. Right-Of-Way (ROW) Maintenance

    Engineering / Public Works | Page

    which prolongs the life of the city streets. The street crack sealing which follows the schedule of a 10 ... will be notified in writing that the owner must replace it within 60 days. As an incentive to use ... unlawful support remaining after the expiration of the 60-day period will be removed and replaced by the ...

  7. Building Permits, Code & Inspections

    Community Development | Page

    & Inspections Sort A to Z gr_bldg_zoning_permit_app_2019.pdf CITY OF GRAND RAPIDS Website: ... construction authorized is not commenced within 180 days, or if construction work is suspended or abandoned for ... a period of 180 days at any time after work is commenced. *Please call GOPHER ONE (1-800-252-1166) before ...

  8. A look inside the Police Department

    Police | News/Press Release | Jan 7, 2022

    into a city. It is home to over 10,000 people and the commercial hub of Itasca County. The population ... a calling. The department answered over 10,000 calls in 2017 and prided itself in providing professional, ...

  9. Stairs & Guardrails

    Community Development | Page

    stairs, the width of the tread must be at least 10 inches at a point 12 inches from the side where the ... required at the top of an interior stair provided no door swings over the landing. 7 ¾ Inches Max 10 Inches ... through 7 ¾” Max rise 10” Min run Guard required if more than 30” 36” Min LANDINGS AT INTERIOR STAIRS ...

  10. Rob Mattei

    Directory Listing

    Staff Liaison 10.00 Economic Development Authority Mattei Rob Active Economic Development ...

Pages